Design Parameters of Roof Support Systems for Pre-driven Longwall Recovery Rooms
نویسندگان
چکیده
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use predriven longwall recovery rooms. The recovery entry is developed at the longwall stop position and supported ahead of time so that the required combinations of standing and internal supports can be installed before the longwall face approaches. A calibrated three-dimensional finite element model, developed in conjunction with an underground test area, provided the critical components and design principals for a comprehensive parametric study. The study indicates that vertical, horizontal, and shear stresses concentrated on the outby abutment pillar corner of the recovery room resulting in deformations in the immediate roof above the primary roof support anchorage level. The results of the numerical model and field site observations indicated that the combination of the internal bolting system and the standing concrete supports are critical for the successful and safe extraction of the longwall equipment. Cable supports installed at and angle over the pillars can help stabilize the disturbed zone above the adjacent fender and outby pillars, however; standing supports are required in most sedimentary roof conditions to increase stability and assure a safe longwall extraction.
منابع مشابه
Deformation mechanism and optimum design for large cross-sectional longwall installation roadway under compound roof
Both the deformation characters and the failure mode of the large cross-sectional longwall installation roadway under compound roof are becoming an emergent issue than ever before due to the rapid development of modern mining equipment. Various engineering applications have revealed that the insufficient design and inappropriate support technology are the main reasons for the fatal accidents as...
متن کاملA three dimensional geometrical model for calculation of induced stresses surrounding longwall working
There are various criteria that need to be examined alongside each other when designing a longwall mining system. Challenges such as determination of the supported roof width, support system design, caving height determination, lateral or chain pillar size determination, and optimum support design for the main gate and tail gate roadways have to be tackled for this aim. Three-dimensional analys...
متن کاملAnalysis of the design and performance characteristics of pumpable roof supports
Pumpable roof supports are currently being used to provide a safe working environment for longwall mining. Because different pumpable supports are visually similar and installed fundamentally in the same manner as other supports, there is a tendency to believe they all perform the same way. However, there are several design parameters that can affect their performance, including the cementitiou...
متن کاملGateroad Design in Overlying Multi-seam Mines
There are two major design problems for upper seam longwall gateroads operating in a multi-seam environment. The first is to determine the location, magnitude and duration of stress transferred from lower seam mines; and the second is to predict the effect of stress transferred from lower seam mines on opening stability. To solve these problems for both longwall and room-and-pillar mines, case ...
متن کاملOn Diagnosis of Longwall Systems
Nowadays we can observe the change of the structure of energy resources, which leads to the increasing fraction of a renewable energy sources. Traditional underground coal mining loses its significance in a total but there are countries, including Poland, which economy is still coal based. A decreasing coal resources imply an exploitation a becoming harder accessible coal beds what is connected...
متن کامل