Period Selection for Minimal Hyper-period in Real-Time Systems

نویسندگان

  • Ismael Ripoll
  • Rafael Ballester
چکیده

Task period and deadline selection are often used to adjust the workload to the available computational resources. This paper presents a method for adjusting the periods of the tasks which obtains the minimal hyper-period. Task periods are modelled as a range of possible periods. The selected periods are not constrained to be natural numbers, but can also be rational numbers. Without this limitation, the resulting hyper-period is much smaller than that of previous works. Hyper-period for natural periods grows exponentially; with rational periods the worst case is quadratic with the largest period. Our finding has practical applications in several fields of real-time scheduling: lowering complexity in table driven schedulers, reducing search space in model checking analysis, generating synthetic workload for statistical analysis of real-time scheduling algorithms, etc.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluating the Efficiency of Firms with Negative Data in Multi-Period Systems: An Application to Bank ‎Data

Data Envelopment Analysis (DEA) is a mathematical technique to evaluate the performance of firms with multiple inputs and outputs. In conventional DEA models, the efficiency scores of Decision Making Units (DMUs) with non-negative inputs and outputs are evaluated in a special period of time. However, in the real world there are situations wherein performance of firms must be evaluated in multip...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

Supplier selection in supply chain management with disruption risk and credit period concepts

Supplier selection is one of the most critical activities of purchasing management in supply chain and managers increasingly face sourcing decisions of how to selected suppliers. This paper illustrates the development of a sourcing decision that provides support for the buyer firm in supply chain.The models developed here, involved selecting between single and dual sourcing. Outside and local s...

متن کامل

Period and Deadline Selection Problem for Real-Time Systems

Task period adaptations are often used to alleviate temporal overload conditions in real-time systems, as they permit performance guarantee. Existing frameworks assume that only task periods are adjustable parameters and that task deadlines remain unchanged at all times. This paper formally introduces a more general real-time task model where task deadlines, which are less than or equal to task...

متن کامل

Real Time Dynamic Simulation of Power System Using Multiple Microcomputers

Recent developments in the design and manufacture of microcomputers together with improved simulation techniques make it possible to achieve the speed and accuracy required for the dynamic simulation of power systems in real time. This paper presents some experimental results and outlines new ideas on hardware architecture, mathematical algorithms and software development for this purpose. The ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014