Processing of O.f.e Copper Beam Chambers for Pep-ii High Energy Ring

نویسنده

  • E. Hoyt
چکیده

* Work supported by U. S. Department of Energy, contract number DE-AC03-76F00515 Using laboratory scale and full size PEP-II vacuum chambers, chemical cleaning, glow discharge and thermal process effects were evaluated using surface analysis by xray photoelectron spectroscopy (XPS). These processes were optimized to reduce surface carbon and thereby minimize photodesorption gas loads. The relation of surface carbon to ion dose was investigated and compared for pure argon, 5% oxygen in argon, and pure hydrogen plasmas. Argon incorporation was noted only when the copper was oxidized in the mixed gas. Surfaces, stable in ambient atmosphere, were obtained having surface carbon values less than 10%. These optimized recipes will be used in processing copper vacuum chambers for the PEP-II BFactory.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Secondary Electron Yield Measurements and Groove Chambers Updated Tests in the Pep-ii Beam Line*

Beam instability caused by the electron cloud has been observed in positron and proton storage rings and it is expected to be a limiting factor in the performance of the positron Damping Ring (DR) of future Linear Colliders such as ILC and CLIC [1, 2]. In the Positron Low Energy Ring (LER) of the PEP-II accelerator, we have installed vacuum chambers with rectangular grooves in a straight magnet...

متن کامل

The PEP-II Project: Low-Energy Ring Design and Project Status

We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ...

متن کامل

Modeling and simulation of longitudinal dynamics for Low Energy Ring –High Energy Ring at the Positron-Electron Project

A time domain dynamic modeling and simulation tool for beam-cavity interactions in the Low Energy Ring (LER) and High Energy Ring (HER) at the Positron-Electron Project (PEP-II) is presented. Dynamic simulation results for PEP-II are compared to measurements of the actual machine. The motivation for this tool is to explore the stability margins and performance limits of PEP-II radio-frequency (...

متن کامل

Pep-ii Tn-55 Slac-pub-6544 (1994) Calculations of the Radiation Doses to the Electronic Equipment inside the Pep-ii Tunnel

CALCULATIONS OF THE RADIATION DOSES TO THE ELECTRONIC EQUIPMENT INSIDE THE PEP-II TUNNEL J. C. Liu, S. Mao, W. R. Nelson, K. R. Kase and N. E. Ipe Stanford Linear Accelerator Center, MS 48, P.O. Box 4349, Stanford, CA, 94309 Abstract-The PEP-II collaboration is a new physics project at SLAC that utilizes an existing tunnel to house two accelerator storage rings; a low-energy positron ring (4 Ge...

متن کامل

Status of the Pep–ii B-factory High Energy Ring*

The 9 GeV High Energy Ring (HER) of the PEP-II B Factory is an electron storage ring under construction at SLAC. Significant progress has been made in the last year on all systems. As of mid 1996, all 192 dipoles have been installed, with installation of the quadrupoles underway. The vacuum system, for design currents up to 3 A average, is in production using a recently commissioned e-beam weld...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1997