Producing satisfactory outcomes in the implementation phase of PPP infrastructure projects: A fuzzy set qualitative comparative analysis of 27 road constructions in the Netherlands ¬リニ¬リニ¬リニ

نویسنده

  • Stefan Verweij
چکیده

An understudied aspect for the successful completion of PPP infrastructure projects is the extent to which they are satisfactorily implemented. Studying PPP implementation is important though, because well-planned projects can fail if project implementation is inadequately managed. This article aims to find out which management and public–private cooperation approaches produce satisfaction for public procurers in the implementation phase of different kinds of infrastructure projects. To this purpose, twenty-seven Dutch road construction projects are systematically analyzed with fuzzy set qualitative comparative analysis (fsQCA). The results show four configurations that produce satisfaction. It is concluded that externally-oriented management, which is characterized by a stakeholder-oriented project implementation approach, and close public–private cooperation, where public and private partners work together closely and interactively, are important for achieving satisfaction. In less complex projects with narrower scopes, however, the partners may rely on less interactive forms of cooperation, more characterized by monitoring contract compliance. © 2015 Elsevier Ltd. APM and IPMA. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Detained girls' treatment engagement over time: The role of psychopathology and quality of life ¬リニ¬リニ¬リニ

a Department of Special Needs Education, Ghent University, Henri Dunantlaan 2, 9000 Ghent, Belgium b Research Institute of Child Development and Education, University of Amsterdam, Nieuwe Achtergracht 127, WS 1018 Amsterdam, The Netherlands c Department of Child and Adolescent Psychiatry, Curium-Leiden University Medical Center; Endegeesterstraatweg 27, AK 2342, Oegstgeest, The Netherlands d De...

متن کامل

Achieving satisfaction when implementing PPP transportation infrastructure projects: a qualitative comparative analysis of the A15 highway DBFM project

This article investigates how managers in public-private partnership (PPP) projects respond to social or physical events during the implementation of their projects, and which of their responses produce satisfactory outcomes. Multi-value Qualitative Comparative Analysis (mvQCA) was used to examine the events that took place during a large Dutch Design, Build, Finance and Maintain (DBFM) transpo...

متن کامل

Socio-economic disparities in academic achievement: A comparative analysis of mechanisms and pathways ¬リニ

a r t i c l e i n f o Research on educational outcomes conceptualizes socioeconomic condition as a multidimensional construct. Quantitative empirical investigations are generally based on single, composite indicators. However, the use of single, composite indicators does not reveal what mechanisms determine inequalities. We use multigroup confirmatory factor analysis and alignment optimization ...

متن کامل

Leaving school in an economic downturn and self-esteem across early and middle adulthood ¬リニ¬リニ¬リニ

In this study we test whether leaving school in an economic downturn impacts self-esteem. Self-esteem is an important dimension of non-cognitive skill that economists have recently begun to examine. Previous work documents that leaving school in a downturn persistently depresses career outcomes, and career success is an important determinant of self-esteem. We model responses to the Rosenberg S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015