Inapproximability and Polynomial-Time Approximation Algorithm for UET Tasks on Structured Processor Networks
نویسندگان
چکیده
We investigate complexity and approximation results on a processor networks where the communication delay depends on the distance between the processors performing tasks. We then prove that there is no heuristic with a performance guarantee smaller than 4/3 for makespan minimization for precedence graph on a large class of processor networks like hypercube, grid, torus, and so forth, with a fixed diameter δ ∈ . We extend complexity resultswhen the precedence graph is a bipartite graph. We also design an efficient polynomial-time O δ2 -approximation algorithm for the makespan minimization on processor networks with diameter δ.
منابع مشابه
Erratum to "Inapproximability and Polynomial-Time Approximation Algorithm for UET Tasks on Structured Processor Networks"
متن کامل
Minimizing the makespan for a UET bipartite graph on a single processor with an integer precedence delay
We consider a set of tasks of unit execution times and a bipartite precedence delays graph with a positive precedence delay d : an arc (i; j) of this graph means that j can be executed at least d time units after the completion time of i. The problem is to sequence the tasks in order to minimize the makespan. Firstly, we prove that the associated decision problem is NP-complete. Then, we provid...
متن کاملOn the hardness of approximating the UET-UCT scheduling problem with hierarchical communications
We consider the unit execution time unit communication time (UET-UCT) schedulingmodelwith hierarchical communications [1], and we study the impact of the hierarchical communications hypothesis on the hardness of approximation. We prove that there is no polynomial time approximation algorithm with performance guarantee smaller than 5/4 (unless P = NP). This result is an extension of the result o...
متن کاملInapproximability Results for Wavelength Assignment in WDM Optical Networks
We address the issue of inapproximability of the wavelength assignment problem in wavelength division multiplexing (WDM) optical networks. We prove that in an n-node WDM optical network with m lightpaths and maximum load L, if NP = ZPP, for any constant δ > 0, no polynomial time algorithm can achieve approximation ratio n1/2−δ or m1−δ , where NP is the class of problems which can be solved by n...
متن کاملChromatic Scheduling of 1- and 2-Processor UET Tasks on Dedicated Machines with Availability Constraints
We address a generalization of the classical 1and 2-processor UET scheduling problem on dedicated machines. In our chromatic model of scheduling machines have non-simultaneous availability times and tasks have arbitrary release times and due dates. Also, the versatility of our approach makes it possible to generalize all known classical criteria of optimality. Under these constraints we show th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Adv. Operations Research
دوره 2011 شماره
صفحات -
تاریخ انتشار 2011