The Alp Transit Gotthard is an ambitious railway construction project, which will incorporate the world's longest railway tunnel of 57 km travelling through the Swiss Alps and under the St. Gotthard massif. Future passenger trains will journey at speeds of up to 250 km/h, adding further to the highly successful European high-speed network and bringing a huge reduction in travelling time. The combined surveying systems of Leica Geosystems and Amberg Measuring Technique Ltd are greatly assisting the tunnel workers in their dayto-day work not only reducing time needed to ensure that excavation is correctly undertaken, but also making the whole construction process much more efficient and accurate.
منابع مشابه
Numerical Investigation on the Effect of Tunnel Height on Drag Reduction in a High Speed Trimaran
There are different methods to reduce drag in high speed hulls. One of these methods is a change in the shape of the body by adding longitudinal side tunnels. In this paper it has been attempted to determine the influence of the tunnel height on hydrodynamic characteristics of the hull to achieving an optimum shape for the tunnel. To achieve this purpose, numerical simulation of the problem has...
متن کاملSimulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
متن کاملBoundary Element Analysis of a Lined Tunnel Problem
The boundary element technique is a practical problem-solving tool and useful in comparison to other currently popular alternatives. In this paper, a circular tunnel of a diameter 3.4 m is to be excavated through a clayey soil and surrounded by concrete lining of a thickness 0.2 m, so the clear internal diameter is 3.0 m. A plane strain analysis is adopted for such problem and the soil is assum...
متن کاملInvestigation of Hydrodynamic Derivatives of an AUV Based on the Water Tunnel Testing Maneuvers
Coefficients or hydrodynamic derivatives of autonomous underwater vehicles play a key role in their development. The most popular way for the estimation of coefficient is to implement captive model tests such as straight line tests and planar motion mechanism tests in towing tanks. In this paper, investigation of hydrodynamic derivatives was performed based on the water tunnel maneuvers. Forces...
متن کاملEvaluation of structural analysis of tunnel segmental lining using beam-spring method and force-method (Case study: Chamshir water conveyance tunnel)
The joints between segmental rings can withstand a certain amount of bending moment as well as axial and shear forces. Generally, in the structural analysis of tunnel segmental lining, the joints can be modeled as elastic hinges or rotational springs, and their rigidity should be demonstrated in terms of the rigidity of the joints or their rotational stiffness. Therefore, the bending moment act...