A Branch-and-Cut Algorithm for the Non-Preemptive Swapping Problem

نویسندگان

  • Charles Bordenave
  • Michel Gendreau
  • Gilbert Laporte
چکیده

In the Swapping Problem (SP), we are given a complete graph, a set of object types and a vehicle of unit capacity. An initial state specifies the object type currently located at each vertex (at most one type per vertex). A final state describes where these object types must be repositioned. In general there exist several identical objects for a given object type, yielding multiple possible destinations for each object. The SP consists of finding a shortest vehicle route starting and ending at an arbitrary vertex, in such a way that each object is repositioned in its final state. This article exhibits some structural properties of optimal solutions and proposes a branch-and-cut algorithm based on a 0-1 formulation of the problem. Computational results on random instances containing up to 200 vertices and eight object types are reported.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Branch-and-Cut Algorithm for the Non-Preemptive Capacitated Swapping Problem

This paper models and solves a capacitated version of the Non-Preemptive Swapping Problem. This problem is defined on a complete digraphG = (V,A), at every vertex of which there may be one unit of supply of an item, one unit of demand, or both. The objective is to determine a minimum cost capacitated vehicle route to transport the items in such a way that all demands are satisfied. The vehicle ...

متن کامل

A branch-and-cut algorithm for the preemptive swapping problem

In the Swapping Problem (SP), every vertex of a complete graph may supply and demand an object of a known type. A vehicle of unit capacity starting and ending its tour at an arbitrary vertex is available for carrying objects of given types between vertices. The SP consists of determining a minimum cost route that allows the vehicle to satisfy every supply and demand. This article investigates t...

متن کامل

An Exact Algorithm for the Mode Identity Project Scheduling Problem

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

متن کامل

MULTI-OBJECTIVE OPTIMIZATION WITH PREEMPTIVE PRIORITY SUBJECT TO FUZZY RELATION EQUATION CONSTRAINTS

This paper studies a new multi-objective fuzzy optimization prob- lem. The objective function of this study has dierent levels. Therefore, a suitable optimized solution for this problem would be an optimized solution with preemptive priority. Since, the feasible domain is non-convex; the tra- ditional methods cannot be applied. We study this problem and determine some special structures related...

متن کامل

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008