TRBv2: A Platform for Miscellaneous DAQ/TDC Tasks for HADES and FAIR-Experiments
نویسندگان
چکیده
The general-purpose trigger and readout board (TRBv2) with on-board DAQ functionality and extensibility through add on cards has been developed and was used successfully in two beamtimes in the year 2007. The functionality of the TRBv2, already roughly outlined in [1], is described in [2]. Several add on modules, which enhance the functionality/connectivity of the TRBv2, have been developed and commissioned. In this document the functionality of the add ons is described without going into detail of the application in the HADES-experiment, as they are mostly general purpose boards and also of interest for other experiments. The add on boards built are spanning the full range of medium bandwidth (32 times 250MBit/s) data combining, high bandwidth (2 GBit/s optical links) digital data switching, general purpose IO-boards [1] (LVTTL, LVDS, RS485) up to 96 channel analog to digital converters and 62 channel time and amplitude digitization of fast pulses. The TRBv2 provides as the common base the data transport, slow-control and power-supply for the different applications. Data transport to the add ons and (when applicable) to the FEE, and (optionally) in a high-speed and real-time network is done via a dedicated IP-core (TrbNet) protocol.
منابع مشابه
The Central Trigger System (CTS) for the HADES Experiment
During the last year, the HADES detector setup has been improved in order to achieve several goals, in particular to enhance the capability of the readout electronics [1] [2] (up to 10 events/s). This is required to enable HADES to cope with heavy ion beams at SIS18 and later at the SIS100 at FAIR. Here, one of the major changes of the DAQ upgrade was the replacement of the copper-based cables ...
متن کاملUpgrade of the HADES Experiment
The HADES upgrade project aims at improving the granularity of the time-of-flight (TOF) system and the data rate capability to allow for the experiments with heavy ions at SIS18 and later at FAIR. In this report, we outline the current upgrade progress of the HADES experimental setup, in particular for the installation of the RPC chambers, the new MDC, the new RICH electronics, and its data acq...
متن کاملThe HADES Upgrade: first Results
During the year 2010 the HADES Upgrade project has been finalized and the spectrometer has been commissioned in three test beam times at the end of the year. The HADES upgrade program had the following main goals: (1) The installation of a new Resistive Plate Chamber (RPC) detector to increase the time resolution and granularity of the time-of-flight system at the lower polar angles (θ < 45). (...
متن کاملA Generic Monitoring System for HADES and FAIR Experiments
The running DAQ upgrade for the HADES detector is nearly finished. In order to supply the new electronics with a suitable monitoring facility and to prepare for the upcoming FAIR experiments, a versatile monitoring network has been designed [1]. The HADES detector comprises a large variety of different sub-systems. However, a unification of the system bus using General-Purpose Trigger and Reado...
متن کاملEPICS - Experimental Physics and Industrial Control System at GSI
EPICS (Experimental Physics and Industrial Control System) is a widely used scalable control system. At GSI the HADES group uses EPICS since its startup [1]. In order to build a GSI wide knowledge base on EPICS some other projects than HADES are started. For example FOPI is a nice target for different controls developments like the LabView based CS [2] and EPICS. For the FUTURE DAQ project of C...
متن کامل