Managing Underperformance Risk in Project Portfolio Selection
نویسندگان
چکیده
We consider a project selection problem where each project has an uncertain return with partially characterized probability distribution. The decision maker selects a feasible subset of projects so that the risk of the portfolio return not meeting a specified target is minimized. To model and evaluate this risk, we propose and justify a general performance measure, the Underperformance Riskiness Index (URI). We define a special case of the URI, the Entropic Underperformance Riskiness Index (EURI), for the project selection problem. We minimize the EURI of the project portfolio, which is the reciprocal of the absolute risk aversion (ARA) of an ambiguity averse individual with constant ARA who is indi↵erent between the target return with certainty and the uncertain portfolio return. The EURI extends the riskiness index of Aumann and Serrano (2008) by incorporating the target and distributional ambiguity, and controls the underperformance probability for any target level. Our model includes correlation and interaction e↵ects such as synergies. Since the model is a discrete nonlinear optimization problem, we derive the optimal solution using Benders decomposition techniques. We show that computationally e cient solution of the model is possible. Furthermore, the project portfolios generated by minimizing the underperformance risk are more than competitive in achieving the target with those found by benchmark approaches, including maximization of expected return, minimization of underperformance probability, mean-variance analysis, and maximization of Roy’s safety-first ratio (1952). When there is only a single constraint for the budget, we describe a heuristic which routinely provides project portfolios with near optimal underperformance risk.
منابع مشابه
Project Portfolio Risk Response Selection Using Bayesian Belief Networks
Risk identification, impact assessment, and response planning constitute three building blocks of project risk management. Correspondingly, three types of interactions could be envisioned between risks, between impacts of several risks on a portfolio component, and between several responses. While the interdependency of risks is a well-recognized issue, the other two types of interactions remai...
متن کاملA NEW MULTI-OBJECTIVE OPTIMIZATION APPROACH FOR SUSTAINABLE PROJECT PORTFOLIO SELECTION: A REALWORLD APPLICATION UNDER INTERVAL-VALUED FUZZY ENVIRONMENT
Organizations need to evaluate project proposals and select the ones that are the most effective in reaching the strategic goals by considering sustainability issue. In order to enhance the effectiveness and the efficiency of project oriented organizations, in this paper a new multi-objective decision making (MODM) approach of sustainable project portfolio selection is proposed which applies in...
متن کاملAn optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)
In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...
متن کاملMulti-period project portfolio selection under risk considerations and stochastic income
This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, con...
متن کاملProject Portfolio Selection with the Maximization of Net Present Value
Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Operations Research
دوره 63 شماره
صفحات -
تاریخ انتشار 2015