Rescheduling of Railway Rolling Stock with Dynamic Passenger Flows
نویسندگان
چکیده
AND
منابع مشابه
A Comparison of Two Exact Methods for Passenger Railway Rolling Stock (Re)Scheduling
In passenger railway optimization one of the main goals is to make efficient plans that can accommodate all passengers or, if that is not possible, that minimize the seat shortages. In the planning process, a railway operator tries to match the demand by first selecting an appropriate timetable followed by a matching rolling stock schedule. We focus on the second stage where a rolling stock sch...
متن کاملA rolling horizon approach for disruption management of railway rolling stock
This paper deals with real-time disruption management of rolling stock in passenger railway transportation. We describe a generic framework for dealing with disruptions of railway rolling stock schedules. The framework is presented as an online combinatorial decision problem, where the uncertainty of a disruption is modeled by a sequence of information updates. To decompose the problem and to r...
متن کاملIntegration of timetable planning and rolling stock in rapid transit networks
The aim of this paper is to propose an integrated planning model to adequate the offered capacity and system frequencies to attend the increased passenger demand and traffic congestion around urban and suburban areas. The railway capacity is studied in line planning, however, these planned frequencies were obtained without accounting for rolling stock flows through the rapid transit network. In...
متن کاملAlgorithmic Support for Railway Disruption Management
Disruptions of a railway system are responsible for longer travel times and much discomfort for the passengers. Since disruptions are inevitable, the railway system should be prepared to deal with them effectively. This paper explains that, in case of a disruption, rescheduling the timetable, the rolling stock circulation, and the crew duties is so complex that solving them manually is too time...
متن کاملA Branch-and-Price Framework for Railway Rolling Stock Rescheduling During Disruptions
Rescheduling rolling stock during a disruption is a passenger railway optimization problem. In current practice this is typically optimized manually despite the high complexity and high runtime requirements of the task. In this paper we propose a path-based mathematical formulation that is solved using column generation in a complete Branch-and-Price framework. In contrast to flow-based approac...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Transportation Science
دوره 49 شماره
صفحات -
تاریخ انتشار 2015