Optimum production and inspection modeling with minimal repair and rework considerations
نویسنده
چکیده
This paper extends an integrated model of economic production quantity (EPQ) and preventive maintenance (PM) to incorporate possibilities of minimal repair and rework. Our model determines simultaneously the optimal number of inspections, the inspection interval, the EPQ, and the PM level. Numerical examples of Weibull shock models are given to show that allowing minimal repair and rework will raise the expected profit. Our analyses demonstrate that both minimal repair and rework significantly influence the optimal policy. 2012 Elsevier Inc. All rights reserved.
منابع مشابه
Integrating Quality and Inspection for the Optimal Lot-sizing Problem with Rework, Minimal Repair and Inspection Time
This research is derived an integrated model of economic production quantity, inspection and preventive maintenance to incorporate rework, minimal repair and inspection time for an imperfect production system. Some proportions of non-conforming items are assumed scrap before the rework process start and others are reworked. The rework process is imperfect that is a proportion of the reworked it...
متن کاملAbsorbing Markov Chain Models to Determine Optimum Process Target Levels in Production Systems with Rework and Scrapping
In this paper, absorbing Markov chain models are developed to determine the optimum process mean levels for both a single-stage and a serial two-stage production system in which items are inspected for conformity with their specification limits. When the value of the quality characteristic of an item falls below a lower limit, the item is scrapped. If it falls above an upper limit, the item is ...
متن کاملLot sizing with rework and different inspection costs
This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...
متن کاملEconomic Production Quantity in Reworkable Production Systems with Inspection Errors, Scraps and Backlogging
The classical economic production quantity (EPQ) model is a well-known and commonly used inventory control technique. Common assumptions in this model are that all units produced are of perfect quality and shortage is not allowed, since in practice shortage, non-conforming product or scrap items are possible, these assumptions will underestimate the actual required quantity. The objective of th...
متن کاملOptimal Process Adjustment with Considering Variable Costs for Uni-variate and Multi-variate Production Process (RESEARCH NOTE)
This paper studies a single-stage production system, two-stage production system where specification limits are designed for inspection. When quality characteristics fall below a lower threshold or above an upper threshold, a decision is made to rework or scrap the item. The target is to determine the optimum target for a process based on rework or scrap costs. In contrast to previous studies, ...
متن کامل