An Iteger Programming Model for Open Shop Scheduling Problem
نویسنده
چکیده
This paper deals with multi-operation models, which are different from the flow shop and job shop models. In the flow shop or job shop models, the routes of all jobs are known in advance. In practice, the route of the job is often immaterial and up to the scheduler to decide. When the routes of the jobs are open, the model is referred to as an open shop. This paper describes the development of integer programming (IP) technique for the open shop scheduling problem with the objective of minimizing makespan.
منابع مشابه
An electromagnetism-like metaheuristic for open-shop problems with no buffer
This paper considers open-shop scheduling with no intermediate buffer to minimize total tardiness. This problem occurs in many production settings, in the plastic molding, chemical, and food processing industries. The paper mathematically formulates the problem by a mixed integer linear program. The problem can be optimally solved by the model. The paper also develops a novel metaheuristic base...
متن کاملA Stochastic Model for Prioritized Outpatient Scheduling in a Radiology Center
This paper discussed the scheduling problem of outpatients in a radiology center with an emphasis on priority. To more compatibility to real-world conditions, we assume that the elapsed times in different stages to be uncertain that follow from the specific distribution function. The objective is to minimize outpatients’ total spent time in a radiology center. The problem is formulated as a fle...
متن کاملGeneralized Cyclic Open Shop Scheduling and a Hybrid Algorithm
In this paper, we first introduce a generalized version of open shop scheduling (OSS), called generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of metaheuristic to solve this problem. Open shop scheduling is concerned with processing n jobs on m machines, where each job has exactly m operations and operation i of each job has to be processed on machine i . However...
متن کاملMinimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...
متن کاملA Tabu Search Method for a New Bi-Objective Open Shop Scheduling Problem by a Fuzzy Multi-Objective Decision Making Approach (RESEARCH NOTE)
This paper proposes a novel, bi-objective mixed-integer mathematical programming for an open shop scheduling problem (OSSP) that minimizes the mean tardiness and the mean completion time. To obtain the efficient (Pareto-optimal) solutions, a fuzzy multi-objective decision making (fuzzy MODM) approach is applied. By the use of this approach, the related auxiliary single objective formulation can...