Scheduling a two-machine robotic cell: A solvable case

نویسنده

  • Eugene Levner
چکیده

The paper deals with the scheduling of a robotic cell in which jobs are processed on two tandem machines. The job transportation between the machines is done by a transportation robot. The robotic cell has limitations on the intermediate space between the machines for storing the work-in-process. What complicates the scheduling problem is that the loading/unloading operation times are non-negligible. Given the total number of operations n, an optimal O(n log n)-time algorithm is proposed together with the proof of optimality.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

بهینه سازی هزینه کل تولید و زمان در سلول رباتیک سه ماشین

In this research, robotic cell scheduling problem with three CNC machines and with an operation on each machine with the purpose of optimizing manufacturing cost and time in S1 cycle has been investigated. To obtain the optimal total cost of production has been used the optimal processing time on machine operation. In this research, robotic cell scheduling is studied in three different situatio...

متن کامل

A scalarization-based method for multiple part-type scheduling of two-machine robotic systems with non-destructive testing technologies

This paper analyzes the performance of a robotic system with two machines in which machines are configured in a circular layout and produce non-identical parts repetitively. The non-destructive testing (NDT) is performed by a stationary robotic arm located in the center of the circle, or a cluster tool. The robotic arm integrates multiple tasks, mainly the NDT of the part and its transition bet...

متن کامل

A New Solution for the Cyclic Multiple-Part Type Three-Machine Robotic Cell Problem based on the Particle Swarm Meta-heuristic

In this paper, we develop a new mathematical model for a cyclic multiple-part type threemachine robotic cell problem. In this robotic cell a robot is used for material handling. The objective is finding a part sequence to minimize the cycle time (i.e.; maximize the throughput) with assumption of known robot movement. The developed model is based on Petri nets and provides a new method to calcul...

متن کامل

Two-machine robotic cell considering different loading and unloading times

In this paper, the researchers have investigated a Concatenated Robot Move (CRM) sequence problem and Minimal Part Set (MPS) schedule problem with different setup times for two-machine robotic cell. They have focused on simultaneous solving of CRM sequence and MPS schedule problems with different loading and unloading times. They have applied a Simulated Annealing (SA) algorithm to provide a go...

متن کامل

Scheduling with two non-unit task lengths is NP-complete

We consider the non-preemptive task scheduling problem with release times and deadlines on a single machine parameterized by the set of task lengths the tasks can have. The identical task lengths case is known to be solvable in polynomial time. We prove that the problem with two task lengths is NP-complete, except for the case in which the short jobs have unit task length, which was already kno...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005