Development of a Rule-Based Finite Capacity Scheduling System

ثبت نشده
چکیده

This paper discusses the use of the finite capacity planning model as a basis for a job-shop scheduling system. The suitability of this approach for constructing short term schedules with very short lead times is examined. This paper introduces a rule-based scheduling system whose operation, unlike previous monolithic schedulers, is based around distinct though interlinked processes. Scheduling herein is defined as the selection of a set of orders for manufacture, and the allocation of processing time to each on an acyclic network of processing resources. The objectives are, firstly, compliance with all customer deadlines and, secondly, the efficient utilisation of available machine time and prevailing machine setups.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Simulation-Based Optimization Model for Scheduling New Product Development Projects in Research and Development Centers

a simulation-based optimization approach for the purpose of finding a near-optimal answer can be efficient and effective. In the present paper, first, the mathematical model for the project activity scheduling problem has been presented with a job shop approach. Then, using the Arena 14 software, the simulation model has been designed. Consequently, a numerical example has been solved via runni...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

Optimal Scheduling of Coordinated Wind-Pumped Storage-Thermal System Considering Environmental Emission Based on GA Based Heuristic Optimization Algorithm

The integration of renewable wind and pumped storage with thermal power generation allows for dispatch of wind energy by generation companies (GENCOs) interested in participation in energy and ancillary services markets. However, to realize the maximum economic profit, optimal coordination and accounting for reduction in cost for environmental emission is necessary. The goal of this study is to...

متن کامل

Simulation-Based Modular Scheduling System of Semiconductor Manufacturing

For example, Wein (1988) compared various release control strategies and scheduling rules and provided the better combinations of release control strategy and scheduling rule for three kinds of HP 24 models. Peyrol et al. (1993) implemented a simulated annealing methodology to determine the input order of a given set of products so as to minimize the average residence time of these products in ...

متن کامل

Bearing Capacity of Strip Footings near Slopes Using Lower Bound Limit Analysis

Stability of foundations near slopes is one of the important and complicated problems in geotechnical engineering, which has been investigated by various methods such as limit equilibrium, limit analysis, slip-line, finite element and discrete element. The complexity of this problem is resulted from the combination of two probable failures: foundation failure and overall slope failure. The curr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005