Potential use of pyrite cinders as raw material in cement production: results of industrial scale trial operations.
نویسندگان
چکیده
Pyrite cinders, which are the waste products of sulphuric acid manufacturing plants, contain hazardous heavy metals with potential environmental risks for disposal. In this study, the potential use of pyrite cinders (PyCs) as iron source in the production of Portland cement clinker was demonstrated at the industrial scale. The chemical and mineralogical analyses of the PyC sample used in this study have revealed that it is essentially a suitable raw material for use as iron source since it contains >87% Fe(2)O(3) mainly in the form of hematite (Fe(2)O(3)) and magnetite (Fe(3)O(4)). The samples of the clinkers produced from PyC in the industrial scale trial operation of 6 months were tested for the conformity of their chemical composition and the physico-mechanical performance of the resultant cement products. The data were compared with the clinker products of the iron ore, which is used as the raw material for the production Portland cement clinker in the plant. The chemical compositions of all the clinker products of PyC appeared to conform to those of the iron ore clinker, and hence, a Portland cement clinker. The mechanical performance of the mortars prepared from the PyC clinker was found to be consistent with those of the industrial cements e.g. CEM I type cements. It can be inferred from the leachability tests (TCLP and SPLP) that PyC could be a potential source of heavy metal pollution while the mortar samples obtained from the PyC clinkers present no environmental problems. These findings suggest that the waste pyrite cinders can be readily used as iron source for the production of Portland cement. The availability of PyC in large quantities at low cost provides further significant benefits for the management/environmental practices of these wastes and for the reduction of mining and processing costs of cement raw materials.
منابع مشابه
Modeling and Optimization of Truck-Shovel Allocation to Mining Faces in Cement Quarry
Truck and shovel are the most common raw material transportation system used in the cement quarry operations. One of the major challenges associated with the cement quarry operations is the efficient allocation of truck and shovel to the mining faces. In order to minimize the truck and shovel operating cost, subject to quantity and quality constraints, the mixed integer linear programing (MILP)...
متن کاملTaftan Pozzolan-Based Geopolymer Cement
Abstract: In recent years, many research works have been done to investigate the possibility of utilizing a broad range of materials as raw materials in the production of geopolymer cements. The use of artificial pozzolans or aluminosilicate-type industrial waste materials such as granulated blast-furnace slag and fly ash has been reported in many research works. Natural pozzolans are also al...
متن کاملRecycling Evaluation of Mill Scale in Electric Arc Furnace
A considerable amount of mill scale is generated from steelmaking plants annually. Although some industries use it as raw material however, since it contains iron in the form of FeO, Fe2O3, and Fe3O4, it can be considered as a valuable metallurgical raw material for iron and steelmaking industry as well. Thus, the aim of this study was to evaluate the possibility, efficiency, and consequences o...
متن کاملA model for tracking temperature variation in cold and hot metal working conditions during machining operations
This paper presents a mathematical model that could assist in measuring, monitoring and controlling tem-perature variation in cold and ‘red-hot’ metal working conditions of machining. A numerical analysis tech-nique of the temperature distribution, based on the theory of complex applied potential, was carried out using the principles of relationship analysis between the paths of heat supply in ...
متن کاملCoordination of a Cyclic Three-stage Supply Chain for Fast Moving Consumer Goods
We focus on a three-stage supply chain problem for fast moving consumer goods including a supplier, a manufacturer and customers. There are different orders over identical cycles, to be processed in production site. The problem is to find a joint cyclic schedule of raw material procurement and job scheduling minimized the total cost comprised of raw material ordering cost and holding cost, prod...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Journal of hazardous materials
دوره 166 1 شماره
صفحات -
تاریخ انتشار 2009