Reliability or Inventory? Contracting Strategies for After-Sales Product Support

نویسندگان

  • Sang-Hyun Kim
  • Morris A. Cohen
چکیده

Traditional sourcing arrangements for after-sales support of capital-intensive products such as airplanes, weapons systems, and manufacturing equipment have centered around physical assets. Typically, customers would pay the supplier of maintenance and repair services (usually the product manufacturer) for the resources, such as spare parts, that were needed to maintain the products. In recent years, we have witnessed the emergence of a new service contracting strategy called Performance Based Logistics (PBL). Under PBL, the basis of supplier compensation is actual uptime (or availability) of the product. PBL implementations are now mandated by the Department of Defense for all new system acquisition programs. The goal of this paper is to compare the ine¢ ciencies arising under the traditional (pre-PBL or material contract) and the PBL contract. In both cases, the customer (principal) sets the contract terms, and as a response, the supplier sets the base-stock inventory level of spare parts as well as invests in increasing product reliability. We …nd that, in a majority of situations, both contracts result in suboptimal supply chain performance manifested by low product reliability and high inventory of spares (relative to the …rst-best solution). However, the PBL contract provides stronger incentives to invest in reliability improvements than does the material contract. Moreover, the e¢ ciency of the PBL contract improves (i.e., inventory decreases and reliability increases) if the supplier owns a larger portion of the spare assets. In particular, under a PBL contract when the supplier owns all spare assets, the supply chain becomes coordinated. Our analysis supports a DoD recommendation for transforming suppliers into total service providers of support services who, under the PBL arrangement, assume complete control of service functions, including asset ownership. Email: [email protected], [email protected], [email protected]

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Signaling New Product Reliability with After-Sales Service Contracts

Prior studies on performance-based contracting (PBC) for after-sales services have highlighted its advantages over traditional resource-based contracting (RBC), when products are established and their reliability is known to all parties. We develop a game theoretic model to investigate how these insights are affected when the vendor is privately informed about the reliability of a newly develop...

متن کامل

Signaling Product Quality with After-Sales Service Contracts

Due to its complex nature, after-sales service support for systems such as aircraft engines is commonly outsourced to the vendor. A key input to contracting for such support is system reliability. When producttechnology is new, the vendor often knows more about reliability than the buyer, potentially leading to contractual inefficiencies. This paper examines the role of after-sales contracts as...

متن کامل

Reliability or Inventory? Analysis of Product Support Contracts in the Defense Industry

In the defense industry, traditional sourcing arrangements for after-sales support of weapons systems (“products”) have centered around physical assets. Typically, the customer, a military service, would pay the supplier of maintenance services in proportion to the resources used, such as spare parts, that are needed to maintain the product. In recent years, we have witnessed the emergence of a...

متن کامل

Reliability or Inventory? An Analysis of Performance-Based Contracts for Product Support Services

Traditional sourcing arrangements for after-sales product support have centered around physical assets. Typically, a customer would pay the supplier of maintenance services in proportion to the resources used, such as spare parts, that are needed to maintain the product. In recent years, we have witnessed the emergence of a new service contracting strategy called performance-based contracting (...

متن کامل

Incentives in Multi-Indenture Service Supply Chains

In recent years, performance-based contracting (PBC) has emerged as an e¤ective means to align the incentives of the …rms engaged in after-sales repair and maintenance services of highvalued and customized products, such as industrial equipment and aircraft. In particular, PBC has proved to promote improvement of product reliability, an important determinant of product performance. However, idi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007