Solving two-machine assembly scheduling problems with inventory constraints

نویسندگان

  • Daria Terekhov
  • Mustafa K. Dogru
  • Ulas Özen
  • J. Christopher Beck
چکیده

This paper considers a scheduling problem with component availability constraints in a supply chain consisting of two manufacturing facilities and a merge-in-transit facility. Three mixed-integer programming (MIP) models and a constraint programming (CP) model are compared in an extensive numerical study. Results show that when there are no components shared among the two manufacturers, the MIP model based on time-index variables is the best for proving optimality for problems with short processing times whereas the CP model tends to perform better than the others for problems with a large range of processing times. When shared components are added, the performance of all models deteriorates, with the time-indexed MIP providing the best results. By explicitly modelling the dependence of scheduling decisions on the availability of component parts, we provide a step toward a framework for integration of inventory and scheduling decisions, which is necessary for solving realistic supply chain problems.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

New Formulation and Solution in PCB Assembly Systems with Parallel Batch processors

This paper considers the scheduling problem of parallel batch processing machines with non-identical job size and processing time. In this paper, a new mathematical model with ready time and batch size constraints is presented to formulate the problem mathematically, in which simultaneous reduction of the makespan and earliness-tardiness is the objective function. In recent years, the nature-in...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 63  شماره 

صفحات  -

تاریخ انتشار 2012