Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
نویسنده
چکیده
This paper investigates scheduling problems with simultaneous considerations of deterioration effects and deteriorating multi-maintenance activities on unrelated parallel machines. We examine two models of scheduling with the deterioration effect, namely the job-dependent and position-dependent deterioration model and the time-dependent deterioration model. We assume that each machine may be subject to several maintenance activities over the scheduling horizon, and the duration of maintenance on a machine depends on its running time. Moreover, due to the restriction of the budget of maintenance, the upper bound of the total maintenance frequencies on all the machines is assumed to be known in advance. The objective is to find jointly the optimal maintenance frequencies, the optimal maintenance positions, and the optimal job sequences such that the total completion time is minimized. If the number of machines is fixed, we introduce polynomial time solutions for all the versions of the problem under study. 2012 Elsevier Inc. All rights reserved.
منابع مشابه
Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملTwo meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning
This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...
متن کاملUnrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
We study the problem of unrelated parallel-machine scheduling with deteriorating maintenance activities. Each machine has at most one maintenance activity, which can be performed at any time throughout the planning horizon. The length of the maintenance activity increases linearly with its starting time. The objective is to minimize the total completion time or the total machine load. We show t...
متن کامل