Cost Minimization for a Multi-Product Fabrication-Distribution Problem with Commonality, Postponement, and Quality Assurance

نویسندگان

  • Singa Wang Chiu
  • Victoria Chiu
  • Yuan-Shyi Peter Chiu
  • Fazal Mahomed
چکیده

To gain more competitive advantages and attract more customers from the turbulent business environment, manufacturing firms today must offer a wide variety of products to marketplaces. The existence of component commonality in multi-product fabrication planning enables managers to reevaluate different production design alternatives to lower overall production relevant costs. Motivated by assisting managers of manufacturing firms in gaining competitive advantages, maximizing machine utilization, and reducing overall quality and fabrication-distribution costs, this study explores a multi-product fabrication-distribution problem with component commonality, postponement, and quality assurance. A two-stage single-machine production scheme with the reworking of repairable nonconforming items is proposed. The first stage fabricates common intermediate components for all products, and the second stage produces and distributes end products under a common cycle time policy. Mathematical modeling and optimization techniques are utilized to derive the optimal fabrication-distribution policy that minimizes the expected total system costs of the problem. Finally, we provide a numerical example with sensitivity analyses to not only show practical uses of the obtained results, but also demonstrate that the proposed production scheme is beneficial in terms of cost savings and cycle time reduction as compared to that in a single-stage production scheme. The research results enable manufacturers to gain more competitive advantages in the turbulent global business environment.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of Material Flows in a Multi-echelon Assembly Supply Chain

This study aims to minimize the total cost of a four-echelon supply chain including suppliers, an assembler, distributers, and retailers. The total cost consists of purchasing raw materials from the suppliers by the assembler, assembling the final product, materials transportation from the suppliers to the assembler, product transportation from the assembler to the distributors, product transpo...

متن کامل

A Multi-Periodic Multi-Product Inventory Control Problem with Discount: GA Optimization Algorithm

In this article, a finite horizon, multi product and multi period economic order quantity like seasonal items is considered where demand rate is deterministic and known but variable in each period. The order quantities of items come in batch sizes and the end of the period order quantity and, consequently, demand of customers are zero. In addition, storage space is constrained and the problem...

متن کامل

Multi-Objective Optimization for Multi-Product Multi-Period Four Echelon Supply Chain Problems Under Uncertainty

The multi-objective optimization for a multi-product multi-period four-echelon supply chain network consisting of manufacturing plants, distribution centers (DCs) and retailers each with uncertain services and uncertain customer nodes are aimed in this paper. The two objectives are minimization of the total supply chain cost and maximization of the average number of products dispatched to custo...

متن کامل

A Supplier Selection Model for Social Responsible Supply Chain

Due to the importance of supplier selection issue in supply chain management (SCM) and ,also,  the increasing tendency of organizations to their social responsibilities, In this paper, we survey the supplier selection issue as a multi objective problem while considering the factor of corporate social responsibility (CSR) as a mathematical parameter. The purpose of this paper is to design a mode...

متن کامل

A Multi-Objective Particle Swarm Optimization for Mixed-Model Assembly Line Balancing with Different Skilled Workers

This paper presents a multi-objective Particle Swarm Optimization (PSO) algorithm for worker assignment and mixed-model assembly line balancing problem when task times depend on the worker’s skill level. The objectives of this model are minimization of the number of stations (equivalent to the maximization of the weighted line efficiency), minimization of the weighted smoothness index and minim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016