Asset Simulation and Life Cycle Assessment for Gas Insulated Substation

نویسندگان

  • G. BALZER
  • C. NEUMANN
چکیده

An important task of the asset management process is the evaluation of the long-range investment and resource planning of the assets of the complete power system and the life cycle cost assessment of different type of substations. The calculation of the long-range investment and resource planning can be performed by using dynamic asset simulation tools, which represent the statistical behavior of the complete asset group over a time range of 40 to 60 years. The final result is the evaluation of the total investment and operational expenditures as well as the comparison of different investment and maintenance strategies. The replacement rate of the different types of asset can be described by statistical data, e.g. Gaussian density functions, which can be gained from experience of the asset manager or from published reports. Depending on the age distribution of the installed assets, the number of the components to be replaced over the simulated time range can be evaluated. Under consideration of the yearly outage and maintenance costs the total costs of ownership can be calculated each year depending on the different group of costs. With consideration of the different expenditures and the knowledge how many components per year have to be maintained and replaced and on the basis of the failure rates (“major” and "minor" failures), in principle it is possible to evaluate the total expenditures for a group of equipment and in consequence for the entire system during the complete simulation period (e. g. 50 years). The life cycle cost (LCC) assessment consists of three main cost elements, the cost of acquisition, the cost of ownership and the renewal cost. These three cost elements are evaluated based on experience and on statistical data. According to the present value method all payments in the future, i. e. cost of ownership (costs for scheduled and unplanned maintenance) and renewal costs, have to be represented as present values related to the year 0, at which an interest rate of 10% and an inflation rate of 2.15% per year is taken into account. Finally, for evaluation of the total life cycle costs the different cost shares are accumulated, at which a period of consideration of 40 years and 50 years respectively is regarded.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Mitigation of Transient Overvoltages Generated Due to Switching Operations and Lightning in Gas-insulated Substation (GIS) Without Extra Limiter

Gas-insulated substations (GIS) have different specifications in proportion to air-insulated substations. Transformer failures related to lightning and switching are often reported in the gas insulated substation (GIS). This problem is the voltage magnifications due to reflections of switching and lightning surges at various junctions within the GIS. thereby overvoltages in GIS are more importa...

متن کامل

Analysis of effective factors on transient ground potential rise in gas insulated substations

This study presents the manner in which transient modeling concepts, which are fully analyzed in the referred standards, are implemented, for the purpose of evaluating the Transient Ground Potential Rise (TGPR). This is a phenomenon of 10–100kV voltages with up to 10μs duration on the grounded enclosure of Gas Insulated Substations (GIS), which may cause concern for personnel safety and problem...

متن کامل

Analysis of effective factors on transient ground potential rise in gas insulated substations

This study presents the manner in which transient modeling concepts, which are fully analyzed in the referred standards, are implemented, for the purpose of evaluating the Transient Ground Potential Rise (TGPR). This is a phenomenon of 10–100kV voltages with up to 10µs duration on the grounded enclosure of Gas Insulated Substations (GIS), which may cause concern for personnel safety and pro...

متن کامل

Nanocrystalline to Suppress VFTO and VFTC for 245kV Gas Insulated Substations

Switching of disconnectors (DS) and various faults in Gas Insulated Substation (GIS) causes number of pre-strikes and re-strikes happens. The short duration voltage collapse, traveling surges in busbar causes Very Fast Transient Over voltages (VFTO) and Very fast Transient Currents (VFTC) in the GIS substation. The main challenge is to reduce VFTO and VFTC amplitudes. Several methods have been ...

متن کامل

Finite Element Method Application in Analyzing Magnetic Fields of High Current Bus Duct

The goal of paper is to present the magnetic field calculations in high current bus ducts. Finiteelement method is used to do this. Bus ducts under study have figure such as circle area. Thecalculations will be using mathematical relations, meshed geometric shape and analyzing them.Geometric mean will help us to determine the value of magnetic field. COMSOL software is appliedfor simulation stu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010