Creative Problem Management in Web-Tutored Programming Projects
نویسندگان
چکیده
The ability to support students’ learning processes efficiently during web-tutored programming project course is a key factor to success. In order to enrich the supportive efforts we need to build specific environments to fulfill this requirement. One of the most interesting methods to be used in such environment are various problem-solving tools which help the student to solve relevant problems in a creative way. The environment equipped with such tools could both support students in various situations and ease the workload of the instructors in the tutoring task .
منابع مشابه
A stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملStochastic Facilities location Model by Using Stochastic Programming
Finding the location for plans like factories or warehousesfor any organization is an important and strategic decision. Costs oftransportation which are the main part of the price of the goods, is thefunction of the location of these projects. to find the optimum locationof these projects, there have been various methods proposed which areusually defined (not random). In reality and in dealing ...
متن کاملA mathematical model for balancing (cost-time-quality and environmental risks) in oil and gas projects and solving it by multi-objective Bee Colony Algorithm
Today, in large projects such as constructing oil, gas and petrochemical refineries, it is inevitable to use modern management methods and project timing. On the other hand, in classic scheduling case, the focus is on balance between time and cost of carrying out projects, which in such a situation, one of possible solutions to shorten time of implementing project is to accelerate activities. T...
متن کاملMethodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کاملThe project portfolio selection and scheduling problem: mathematical model and algorithms
This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...
متن کامل