Equipment Selection for Surface Mining: A Review

نویسندگان

  • Christina N. Burt
  • Lou Caccetta
چکیده

One of the challenging problems for surface mining operation optimization is choosing the optimal truck and loader fleet. This problem is the Equipment Selection Problem (ESP). In this paper, we describe the ESP in the context of surface mining. We discuss related problems and applications. Within the scope of both the ESP and related problems, we outline modeling and solution approaches. Using operations research literature as a guide, we conclude by pointing to future research directions to improve both the modeling and solution outcomes for practical application of this problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of a suitable extraction equipment in mechanized longwall mining in steeply inclined coal seams using fuzzy analytical hierarchy method (Case study: Hamkar coal mine, Iran)

The longwall mining method is one of the most applied methods in extracting low-inclined to high-inclined coal seams. Selection of the most suitable extraction equipment is very important in the economical, safety, and productivity aspects of mining operations. There are a lot of parameters affecting the selection of an extraction equipment in mechanized longwall mining in steeply inclined coal...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

Equipment selection with heterogeneous fleets for multiple-period schedules

Abstract. In a simple surface mining scenario we can consider the mine to have one mining location and one dump-site connected by a lone truck route. Our objective is to determine a purchase and salvage policy for trucks and loaders such that the cost of materials handling is minimized over a multiple period schedule. This problem quickly becomes large scale when we consider large sets of possi...

متن کامل

Improving Performance of Mining Equipment Through Enhancement of Speed Factor: A Case Study (Research Note)

Loading and hauling machineries are highly capital intensive equipment to procure, operate and maintain in surface mining operation. It must be borne in mind that with this huge and capital-intensive equipment, every second of its life time is absolutely important from the production and productivity point of view. As such, it is imperative to optimize the overall cycle time and speed factor of...

متن کامل

Operational dynamics of “Galamsey” within eleven selected districts of western region of Ghana

The uncontrolled spread of illegal artisanal small-scale gold mining (ASM), popularly termed “galamsey” in Ghana, has, for decades, impacted adversely upon water bodies, soils, wildlife, human health, and safety. A lack of understanding, however, of the types of galamsey, their operational attributes, and their relative impacts has unfortunately hindered an effective policy response despite num...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Interfaces

دوره 44  شماره 

صفحات  -

تاریخ انتشار 2014