Case and Constraint-Based Apartment Construction Project Planning System: FASTrak-APT

نویسندگان

  • Kyoung Jun Lee
  • Hyun Woo Kim
  • Jae Kyu Lee
  • Tae Hwan Kim
  • Chang Gon Kim
  • Myoung Kyun Yoon
  • Eui Jun Hwang
  • Hyun Jeong Park
چکیده

*Korea Advanced Institute of Science and Technology, **Hyundai Information Technology, Co., Ltd., ***Hyundai Engineering and Construction, Co., Ltd. *Dept. of MIS, 207-43, Cheongryang, Seoul 130-012, Korea. ** Technology Support Division, 140-2, Kye-dong, Chongro-ku, Seoul, Korea. ***Construction Management Dept., 140-2, Kye-dong, Chongro-ku, Seoul, Korea. *{leekj, jklee}@msd.kaist.ac.kr, **[email protected], ***[email protected]

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Case- and Constraint-Based Project Planning for Apartment Construction

ment construction project network, Hyundai Engineering and Construction and Korea Advanced Institute of Science and Technology developed a caseand constraint-based project-planning expert system for an apartment domain. The system, FASTRAK-APT, is inspired by the use of previous cases by a human expert project planner for planning a new project and the modification of these cases by the project...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

A Cost-based Interior Design Decision Support System for Large-scale Housing Projects

In the early stages of a large-scale housing project, many interior design alternatives remain to be confirmed after a rough review of the costs. The project participants move on to the later stages of budgeting and construction without the exact information on the interior costs, and several occasions may arise when costs increase or time delays occur, driven by interior design specification c...

متن کامل

Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...

متن کامل

Work breakdown structure (WBS) development for underground construction

a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1997