A Maximum Utility Solution to a Vehicle Constrained Tanker Scheduling Problem
نویسندگان
چکیده
A modification to the Dantzig and Fulkerson tanker scheduling problem is described. An insufficient number of vehicles and a utility associated with each vehicle delivery are assumed. The new problem is shown to be equivalent to a transshipment problem, the solution of which is the same as the maximal utility solution of the modified tanker scheduling problem. An example is given.
منابع مشابه
The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملThe Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملDetecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach
This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...
متن کاملSolving a bi-objective manpower scheduling problem considering the utility of objective functions
This paper presents a novel bi-objective manpower scheduling problem that minimizes the penalty resulted from employees’ assignment at lower skill levels than their real skill and maximizes employees’ utility for working at a special skill level in some shifts or on some days. Employees are classified in two specialist groups and three skill levels in each specialization. In addition, the prese...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...