Minimizing the overheads of dependent {AND}-parallelism

نویسندگان

  • Peter Wang
  • Zoltan Somogyi
چکیده

Parallel implementations of programming languages need to control synchronization overheads. Synchronization is essential for ensuring the correctness of parallel code, yet it adds overheads that aren’t present in sequential programs. This is an important problem for parallel logic programming systems, because almost every action in such programs requires accessing variables, and the traditional approach of adding synchronization code to all such accesses is so prohibitively expensive that a parallel version of the program may run more slowly on four processors than a sequential version would run on one processor. We present a program transformation for implementing dependent AND-parallelism in logic programming languages that uses mode information to add synchronization code only to the variable accesses that actually need it. 1998 ACM Subject Classification D.3.3 Concurrent Programming Structures, D.3.4 Compilers

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Study of the Role of Repetition of Music in the Nimayee Poems of Akhavan Sales

In this article, the aim of the authors is to study the role of repetition in creating music and parallelism in Nimayee poems in the three collections of poems by Mehdi Akhavan Sales: Zamestan, Akhere Shahname and Az Avesta. Accordingly, the researchers have investigated the various manners of repetition in creating parallelism in the poems at three levels: phonological parallelism, lexical par...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

A Partitioning strategy for OODB

An effective strategy for distributing data across multiple disks is crucial to achieving good performance in a parallel objectoriented database management system. During query processing, a large amount of data need to be processed and transferred among the processing nodes in the system. A good data placement strategy should be able to reduce the communication overheads, and, at the same time...

متن کامل

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011