Constraint Modeling and Buffer Management with Integrated Production Scheduler

نویسندگان

  • David
  • K. H. Chua
  • Li Jun Shen
چکیده

Constraint modeling is a necessary step in construction planning. The basic CPM approach provides a simple and practical means for resolving time-related precedence constraints between activities. However, most CPM-based tools do not support dealing with the constraints regarding resource and information availabilities at the productionlevel planning phase. When these constraints are concealed in the work plan, it is difficult to assure that they are removed in time so that work takes place as planned. Consequently, the reliability of work plans/assignments will be reduced. This paper presents a scheduling tool called integrated production scheduler (IPS) to handle the nonprecedence constraints in supply chain and information flow. The IPS has three main objectives to be fulfilled. The first is to promote work plan reliability. The second is to increase resource utilization and throughput based on the estimated resource profile. The third is to maintain a stable work flow through reducing uncertainties in the supply chain and information flow. To further facilitate reliable planning, a set of schedule buffers are established to help manage the constraints. Specifically, the working buffer and the shielding buffer ensure quality assignments by removing resource conflicts and supply chain uncertainties. The pulling buffer and the screening buffer increase resource and information availabilities by managing the delivery issues in advance. With the proposed schedule buffer management, it is feasible to enhance the reliability of look-ahead plans and consequently achieve lean process management.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Methodology for Integrated Buffer Design and Management in Repetitive Construction Projects

One important challenge of production systems in both manufacturing and construction is the management of the harmful impacts of variability. While both industries have commonly used buffer-based production strategies to deal with the variability issue, construction is characterized for using intuitive, non-general and wasteful buffering strategies. For overcoming these limitations, this paper ...

متن کامل

Real-life Scheduling Using Constraint Programming and Simulation

The paper presents an integrated production planner and job shop scheduler system with flexible modeling capabilities and powerful, scalable solution methods. The system generates close-to-optimal production and capacity plans on the medium term, and detailed production schedules on the short-term. However, the constraint-based, deterministic scheduling model can hardly account for all the unce...

متن کامل

An economic analysis for integrated bi-objective biofuel supply chain design using support vector machine

Using second-generation biomass and biofuel deal with environmental pollution and CO2 emissions. Therefore, this paper design an integrated multi-period bi-objective biofuel supply chain network using support vector machine (SVM) and economic analysis to reduce the cost of generating biofuels and CO2 emissions. The economic analysis consists of three scenarios for supplyin...

متن کامل

Integrated planning for blood platelet production: a robust optimization approach

Perishability of blood products as well as uncertainty in demand amounts complicate the management of blood supply for blood centers. This paper addresses a mixed-integer linear programming model for blood platelets production planning while integrating the processes of blood collection as well as production/testing, inventory control and distribution. Whole blood-derived production methods for...

متن کامل

Queue with Heterogeneous Server Under Resequencing Constraint

In this paper, a markovian queue with two types of servers and buffer space is considered. The resequencing constraint is imposed according to which the customers leave the system in the same order in which they entered it. For finite buffer queue, the steady state queue size distribution has been obtained.? 

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001