A bi-objective analysis of the r-all-neighbor p-center problem

نویسندگان

  • Hugh R. Medal
  • Chase Rainwater
  • Edward A. Pohl
  • Manuel D. Rossetti
چکیده

In this paper we consider a generalization of the p-center problem called the r-all-neighbor p-center problem (RANPCP). The objective of the RANPCP is to minimize the maximum distance from a demand point to its rth-closest located facility. The RANPCP is applicable to facility location with disruptions because it considers the maximum transportation distance after (r − 1) facilities are disrupted. While this problem has been studied from a single-objective perspective, this paper studies two bi-objective versions. The main contributions of this paper are 1) algorithms for computing the Pareto-efficient sets for two pairs of objectives (closest distance vs rth-closest distance and cost vs. rth-closest distance) and 2) an empirical analysis that gives several useful insights into the RANPCP. Based on the empirical results, the RANPCP produces solutions that not only minimize vulnerability but also perform reasonably well when disruptions do not occur. In contrast, if disruptions are not considered when locating facilities, the consequence due to facility disruptions is much higher, on average, than if disruptions had been considered. Thus, our results show the importance of optimizing for vulnerability. Therefore, we recommend a bi-objective analysis.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Efficiency of a multi-objective imperialist competitive algorithm: A bi-objective location-routing-inventory problem with probabilistic routes

An integrated model considers all parameters and elements of different deficiencies in one problem. This paper presents a new integrated model of a supply chain that simultaneously considers facility location, vehicle routing and inventory control problems as well as their interactions in one problem, called location-routing-inventory (LRI) problem. This model also considers stochastic demands ...

متن کامل

Interactive multiple objective programming in optimization of the fully fuzzy quadratic programming problems

In this paper, a quadratic programming (FFQP) problem is considered in which all of the cost coefficients, constraints coefficients, and right hand side of the constraints are characterized by L-R fuzzy numbers. Through this paper, the concept of α- level of fuzzy numbers for the objective function, and the order relations on the fuzzy numbers for the constraints are considered.  To optimize th...

متن کامل

Two optimal algorithms for finding bi-directional shortest path design problem in a block layout

In this paper, Shortest Path Design Problem (SPDP) in which the path is incident to all cells is considered. The bi-directional path is one of the known types of configuration of networks for Automated Guided Vehi-cles (AGV).To solve this problem, two algorithms are developed. For each algorithm an Integer Linear Pro-gramming (ILP) is determined. The objective functions of both algorithms are t...

متن کامل

Bi-objective optimization of multi-server intermodal hub-location-allocation problem in congested systems: modeling and solution

A new multi-objective intermodal hub-location-allocation problem is modeled in this paper in which both the origin and the destination hub facilities are modeled as an M/M/m queuing system. The problem is being formulated as a constrained bi-objective optimization model to minimize the total costs as well as minimizing the total system time. A small-size problem is solved on the GAMS software t...

متن کامل

A HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL

 This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 72  شماره 

صفحات  -

تاریخ انتشار 2014