A Dynamic Population Steady-State Genetic Algorithm for the Resource-Constrained Project Scheduling Problem

نویسندگان

  • Mariamar Cervantes
  • Antonio Luis Lova
  • María Pilar Tormos
  • Federico Barber
چکیده

Resource Constrained Project Scheduling Problem (RCPSP) is a well known problem that is easy to describe but very difficult to solve, and therefore, it has attracted the attention of many researchers over the last few decades. In this context, heuristics are the only option when solving realistically-sized projects. In this paper we develop a steady-state genetic algorithm that uses a dynamic population and four decoding methods. These features allow the algorithm to adapt itself to the characteristics of the problem. Finally, its performance is compared against the best project scheduling methods published so far. The results show that the proposed scheduling method is one of the best scheduling techniques when compared with results reported in the literature.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

An Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation

In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem

This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...

متن کامل

An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008