Workforce-constrained Preventive Maintenance Scheduling Using Evolution Strategies

نویسندگان

  • Sanjay Ahire
  • Garrison W. Greenwood
  • Ajay Gupta
  • Mark Terwilliger
چکیده

Heavy equipment overhaul facilities such as aircraft service centers and rail-yards face the challenge of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring singleor multiple-skills, within workforce availability constraints. In this paper, we examine the utility of evolution strategies (ES) to this problem. Comparison of the computational efforts of ES with exhaustive enumeration (EE) to reach optimal solutions for sixty small problems illustrated the ability of ES to yield optimal solutions increasingly efficiently with increasing problem size. A set of 852 large-scale problems was solved using ES to examine the effects of task-related problem characteristics (number of tasks N, skills required per task SPT, and workers required per task WPT), workforce-related variables (number of workers W, skills per worker SPW), and ES population size (μ) on CPU time. Due to unavailability of optimal solution for comparison, each experiment was stopped at a quasi-optimal solution using a convergence criterion. In the estimated multiplicative power expression, the CPU time requirements using ES were proportional to N (versus e for the EE approach). The maximum CPU time was 55 minutes for a 1000-task problem. The results empirically supported practical utility of ES to solve large-scale, complex PM problems involving single and multiple-skilled workforce. Finally, comparison of convergence speeds of ES and simulated annealing (SA) for the 852 experiments indicated that, on the average, SA needed to search about 12 times the number of solutions searched by ES to converge to the quasi-optimal solution, demonstrating the superiority of the ES approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution Strategies, Workforce Scheduling

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Bi-objective workforce-constrained maintenance scheduling: a case study

In this paper, a real maintenance workforce-constrained scheduling problem is formulated as a bi-objective mixed-integer programming model with the aim of simultaneously minimizing the workforce requirements and maximizing the equipment availability. The skilled workforce is provided by internal and external resources using regular time, overtime and contracting. The equipment availability is m...

متن کامل

Multi-objective Simulated Annealing for a Maintenance Workforce Scheduling Problem: A case Study

A multi-objective simulated annealing (MOSA) algorithm is described in this chapter to solve a real maintenance workforce scheduling problem (MWSP) aimed at simultaneously minimizing the workforce cost and maximizing the equipment availability. Heavy industry maintenance facilities at aircraft service centres, railroad yards and steel companies must contend with scheduling Preventive Maintenanc...

متن کامل

An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach

This paper draws on the “human reliability” concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of de...

متن کامل

Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms

Heavy industry maintenance facilities at aircraft service centers or railroad yards must contend with scheduling preventive maintenance tasks to ensure critical equipment remains available. The workforce that performs these tasks are often high-paid, which means the task scheduling should minimize worker idle time. Idle time can always be minimized by reducing the workforce. However, all preven...

متن کامل

Long Term Cost Effective Preventive Maintenance Scheduling

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Decision Sciences

دوره 31  شماره 

صفحات  -

تاریخ انتشار 2000