Utilization and Predictability in Scheduling the IBM SP2 with Backfilling

نویسندگان

  • Dror G. Feitelson
  • Ahuva Mu'alem
چکیده

Scheduling jobs on the IBM SP2 system is usually done by giving each job a partition of the machine for its exclusive use. Allocating such partitions in the order that the jobs arrive (FCFS scheduling) is fair and predictable, but suffers from severe fragmentation, leading to low utilization. An alternative is to use the EASY scheduler, which uses aggressive backfilling: small jobs are moved ahead to fill in holes in the schedule, provided they do not delay the first job in the queue. We show that a more conservative approach, in which small jobs move ahead only if they do not delay any job in the queue, produces essentially the same benefits in terms of utilization. Our conservative scheme has the added advantage that queueing times can be predicted in advance, whereas in EASY the queueing time is unbounded.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Utilization, Predictability, Workloads, and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling

ÐScheduling jobs on the IBM SP2 system and many other distributed-memory MPPs is usually done by giving each job a partition of the machine for its exclusive use. Allocating such partitions in the order in which the jobs arrive (FCFS scheduling) is fair and predictable, but suffers from severe fragmentation, leading to low utilization. This situation led to the development of the EASY scheduler...

متن کامل

Supporting Priorities and Improving Utilization of the IBM SP2 Scheduler Using Slack Based Backfilling

Running jobs on the IBM SP2, as in most distributed memory parallel system in the market today, is done by giving each job a subset of the available processors for its exclusive use. Scheduling jobs in FCFS order suffers from severe fragmentation that leads to utilization loss. This led Argonne National Lab, where the first large SP1 was installed, to develop the EASY scheduler, which has since...

متن کامل

Supporting Priorities and Improving Utilization of the IBM SP Scheduler Using Slack-Based Backfilling

Distributed memory parallel systems such as the IBM SP2 execute jobs using variable partitioning. Scheduling jobs in FCFS order leads to severe fragmentation and utilization loss, which lead to the development of backfilling scheudlers such as EASY. This paper presents a backfilling scheduler that improves EAST in two ways: It supports both user selected and administrative priorities, and guara...

متن کامل

Utilization and Predictability in Scheduling the IBM SP2 with Back lling

Scheduling jobs on the IBM SP2 system is usually done by giving each job a partition of the machine for its exclusive use. Allocating such partitions in the order that the jobs arrive (FCFS scheduling) is fair and predictable, but su ers from severe fragmentation, leading to low utilization. This motivated Argonne National Lab, where the rst large SP1 was installed, to develop the EASY schedule...

متن کامل

Scheduling Algorithms to Improve Utilization in Toroidal-Interconnected Systems

BlueGene/L is a massively parallel cellular architecture system with a toroidal interconnect, currently being developed at the IBM T.J. Watson Research Center. Cellular architectures with a toroidal interconnect are effective at producing highly scalable computing systems, but typically require job partitions to be both rectangular and contiguous. These restrictions introduce fragmentation issu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998