The Site-Model Construction Component of the RADIUS Testbed System
نویسندگان
چکیده
The central component in the RADIUS modelsupported image exploitation paradigm, is the creation of a 3-dimensional model that captures the basic geometry of the site under examination. While many fully automated methods for site model construction show promising results, none are robust or general enough to replace interactive and semiautomatic techniques. In this paper, we outline the suite of site-model construction tools being assembled for the RADIUS program, a sample scenario for their use, and the results of a study to characterize the potential saving of effort they offer.
منابع مشابه
Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System
The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...
متن کاملMobile Robot Pose Tracking for Performance Analysis
The NIST Construction Metrology and Automation Group, in cooperation with the NIST Intelligent Systems Division, is researching robotic structural steel placement as part of a project to develop an Automated Steel Construction Testbed. The initial phase of this project centers on tracking a six degree-of-freedom robotic crane with a laser-based site measurement system to provide position feedba...
متن کاملA new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
متن کاملFeasibility Study of Using Geographic Data and Information System in Official Statistics (Case Study: Industrial Site Selection in Ardabil Province)
Abstract. The appropriate site selection for the establishment of industries pays attention to a wide range of criteria and combines economic and social benefits with the application of multi-criteria decision making in the environment of the environmental system. It also Ardabil province has a high investment capacity in industrial sectors in terms of site selection investment projects. This ...
متن کاملAdapting a teleoperated device for autonomous control using three-dimensional positioning sensors: experiences with the NIST RoboCrane
The National Institute of Standards and Technology (NIST) Construction Metrology and Automation Group, in cooperation with the NIST Intelligent Systems Division, is researching robotic structural steel placement through an ongoing program entitled ‘‘Performance of Innovative Technologies for Automated Steel Construction.’’ This program, initiated in response to an American Institute of Steel Co...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1996