Investigation of Optimum Crew Transfer Vessel Fleet for Offshore Wind Farm Maintenance Operations

نویسندگان

  • Yalcin Dalgic
  • Iraklis Lazakis
  • Osman Turan
چکیده

The offshore wind industry, which aims to reduce the operational costs, usually achieved through learning curves and supply chain improvements, has seen drastic cost increase over the last five years. In order to sustain the competitiveness of the offshore wind industry against other renewable energy sources, the cost of offshore wind needs to come down to today’s onshore cost. This cost reduction target can be achieved through optimising the offshore related operations which contribute the most to the operating expenditures (OPEX) of the offshore wind farms. In this paper, the investigation of optimum crew transfer vessel fleet, which indicates the influence of fleet size and characteristics of the vessels involved in the operations, is introduced with a focus on power production, total cost of the Operation and Maintenance (O&M) and revenue loss. A time domain Monte-Carlo approach is adopted while taking into consideration the climate parameters, failure characteristics of turbine components, the specification of crew transfer vessels, and the composition of vessel fleet. Through this extensive study, it is concluded the O&M related costs can be reduced significantly while the availability and the productivity of the turbines can be increased by optimising the use of the O&M vessel fleet in terms of fleet size and vessel capabilities.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Decision Support System for Vessel Fleet Analysis for Maintenance Operations at Offshore Wind Farms

This paper presents a decision support system (DSS) for determining the optimal fleet of vessels and helicopters to support maintenance operations at offshore wind farms. This vessel fleet is used to transport maintenance technicians and spare parts to and from the wind farm, and to execute lifts of heavy parts onto the turbines. The cost of the vessel fleet constitutes a major part of the main...

متن کامل

Advanced logistics planning for offshore wind farm operation and maintenance activities

Offshore wind turbine technology is moving forward as a cleaner alternative to the fossil fuelled power production. However, there are a number of challenges in offshore; wind turbines are subject to different loads that are not often experienced onshore and more importantly challenging wind and wave conditions limit the operability of the vessels needed to access offshore wind farms. As the po...

متن کامل

Sensitivity of Offshore Wind Turbine Operation & Maintenance Costs to Operational Parameters

Due to the lack of operator knowledge and the deployment of new technology in future large offshore wind farms, significant uncertainty exists in the field of offshore wind farm operation and maintenance (O&M). In order to investigate this uncertainty as well as explore the feasibility of novel O&M strategies, simulation is required. This paper applies an auto-regressive (AR) climate modeling a...

متن کامل

Evaluation of complex system structures in maintenance processes at offshore wind farms

The evaluation of complex system structures has to address the question “Can the model give a true and correct view of the real situation?” The model has to be investigated with regard to functionality, completeness, correctness, reliability and usability. The offshore wind farm in maintenance status is an example for complex system structures. Furthermore the offshore wind farm is not organise...

متن کامل

An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows

This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the fi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015