Ghazal Ozon River and Preserving the Existent Aquatics While Constructing the Siazakh Dam

نویسنده

  • Reza Gharehkhani
چکیده

The main purpose of the dam is to control the surface streams and rivers across the country. Dam construction and formation of river and big water reservoirs and resources happen in the glen is a big incident which would change its surrounding area considerably. In fact, constructing a dam the glen width is close and fishes don't migrate from upstream to downstream and ultimately it would led to their death. To resolve this, it seems necessity to create a passage for fishes during the construction of dam. It is provided establishing a set of stepped pools overlooking each other as a fish way or fish ladder a proper pathway for moving fishes. In this article we first examine the surrounding environment and then Ghazal Ozon River and preserving the aquatics. Keywords—Ghazal Ozon River, fish way, Dam construction, fish

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Feasibility study and construction of an underground dam in the Daryan watershed (Case Study Mashnaq Underground Dam)

    The water crisis in arid and semi-arid regions is a limiting factor for human activities and sustainable agricultural development. One of the new solutions in this field is the construction of underground dams. Underground dams compared to conventional dams that store river water in open reservoirs; block the subsurface flow of water in the cross-section of the river and store it under the ...

متن کامل

Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...

متن کامل

Spatial and Temporal Variability of Water Quality for Karun River, in Upstream and Downstream Gotvand Dam

In this study, the spatial and temporal variability of water quality including monthly series of TDS, EC, So4, Cl, Ca and Na in common statistical period 1993-2014 was evaluated for the Karun River. This assessment is based on qualitative data stations including Susan in the upstream of Gotvand reservoir, Gotvand, Mollasani and Ahvaz in the downstream. To determine the parameters trend process,...

متن کامل

Using a special empirical model to estimate sediment yield of Koohbord dam watershed in Kohgilouyeh County

Extended abstract Koohbord dam watershed with a total area of 38.29 square kilometers in Kohgiluyeh and Boyerahmad province is one of the watersheds without sedimentation data, which requires the use of empirical models to estimate the sediment for estimating sediment, so the results obtained through data is the basis of the management plans of dam watershed. In this research, using base maps ...

متن کامل

Effect of Shahid Rajai dam on population dynamics of the Ponticola cyrius in down stream Tajan River

To study the effect of Shahid Rajai Dam on Population dynamics of P. cyrius in downstream of the dam, during the April 2012 to March 2013, sampling was carried out monthly by electro fishing. A total of 564 specimens from the first station, 219 specimens from the second station and 263 specimens from the third station were examined and the sex ratio of male to female 1:1.42, 1:1.2 and 1:0.91 re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011