Single Machine Inserted Idle Time Scheduling with Release Times and Due Dates
نویسنده
چکیده
The single machine scheduling problem is considered in which each task has a release dates, a processing time and a due date. The objective is to mimimize the maximum lateness. Preemption is not allowed. Scheduling problem 1|rj |Lmax is a NP-hard problem. We define an IIT (inserted idle time) schedule as a feasible schedule in which a processor is kept idle at a time when it could begin processing an operation. We propose an approximate IIT algorithm named ELS/IIT (earliest latest start/ inserted idle time) and branch and bound algorithm, which produces a feasible IIT schedule for a fixed the maximum lateness L. In order to optimize over L we must iterate the scheduling process over possible values of L. New dominance criteria are introduced to curtail the enumeration tree. By this approach it is generally possible to eliminate most of the useless nodes generated at the lowest levels of decision tree.
منابع مشابه
A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملThe effect of inserted idle time on the performance of dispatching rules in a flowshop
Inserted idle time occurs when a machine is kept waiting deliberately for the arrival of a job that is still being processed on a preceding machine. A common assumption in most of the existing literature on flowshop scheduling is that inserted idle time is not allowed, and whenever there are jobs that are ready for processing on a given machine, that machine is not kept idle for any reason. Thi...
متن کاملOptimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time
In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...
متن کاملA Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem
This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...
متن کاملA dynamic-programming-based exact algorithm for general single-machine scheduling with machine idle time
This paper proposes an efficient exact algorithm for the general single-machine scheduling problem where machine idle time is permitted. The algorithm is an extension of the authors’ previous algorithm for the problem without machine idle time, which is based on the SSDP (Successive Sublimation Dynamic Programming) method. We first extend our previous algorithm to the problem with machine idle ...