An ABC-Genetic method to solve resource constrained project scheduling problem
نویسندگان
چکیده
The aim of this work is to study the effect of hybridization on the performance of the Artificial Bee Colony (ABC) as a recently introduced metaheuristic for solving Resource Constrained Project Scheduling Problem (RCPSP). For this purposes, the ABC is combined with a Genetic Algorithm (GA). At the initial time, the algorithm generates a set of schedules randomly. The initial solution has been evaluated against constraints, and the infeasible solutions have been resolved to feasible ones. Then, the initial schedules are to be improved iteratively using a hybrid method until termination condition is met. The proposed method works by integrating the ABC and GA search processes. The GA method updates schedules by including the best solutions found by the ABC approach. Next, the ABC method picks the solutions found by GA search. The new methodological approach is used by the algorithm to maintain the priorities of the activities in feasible ranges. The performance of the proposed algorithm has been compared against a set of state-of-art algorithms. The simulation results have demonstrated that the proposed algorithm provides an efficient way for solving RCPSP and produce competitive results compared to other algorithms investigated in this work.
منابع مشابه
An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کاملAn Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...
متن کاملDetecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach
This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Artif. Intell. Research
دوره 1 شماره
صفحات -
تاریخ انتشار 2012