Upgrade of Control System for the BEPCII

نویسنده

  • J. Zhao
چکیده

The BEPC will increase its luminosity ten times with upgrade of both the machine and detector, which is the project BEPCII. The project will be started at beginning of 2002 and finished within 3-4 years. In order to reach the goal of the BEPCII, a number of new equipment will be added in the system, such as the superconducting RF cavities, new magnet power supplies and beam feedback system, and the BEPC control system has to be upgraded. The BEPC control system was built in 1987 and was upgraded in 1994. It is an Open VMS and CAMAC based system, some equipment is controlled by PCs. We are going to upgrade the existing system by EPICS. Several VME IOCs will be added in the system with feildbus, PLCs for the new equipment control. And we will keep the existing system in use, such as CAMAC hardware, PC based sub-control and application programs, which will be merged into the EPICS system. Recently the development of the EPICS prototype has been started. Regard some slow control, commercial SCADA product can be chosen as the development tool. We have just finished a prototype with the SCADA product Wizcon. This paper will describe the system design and development issues.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Control System of the Bepcii

Recently the Chinese Academy of Sciences has chosen BEPCII as the future development of the Beijing Electron Positron Collider (BEPC), i.e. upgrade of both the machine and detector. The luminosity of the machine is expected to increase to 1.0x10cms. The project will be started at the beginning of 2002 and finished within 3-4 years. The BEPC control system was built in 1987 and upgraded in 1994....

متن کامل

The Wire Scanner at Bepcii

To monitor the beam profile in injector of BEPCII which is the upgrade project of Beijing Electron Positron Collider (BEPC). Several beam diagnostic and monitoring instruments are used. Wire scanner as a new diagnostic instrument was designed and manufactured to measure the beam profile at the end of linac in 2007.During the shutdown period of BEPCII we had installed the system at the end of li...

متن کامل

Constructing a Distributed Developing Environment Using Epics for Bepcii Control System

Probe: to debug database records. • Alarm handler ALH The current Beijing Electron Position Collider (BEPC) is going to be upgraded to reach a higher energy as 1.89 GeV and a luminosity of 1.0E33cms. A second storage ring will be installed in the same tunnel of BEPC. The control system of BEPCII will be constructed based on EPICS. During the past two years a basic prototype has been set up, inc...

متن کامل

The Electron Cloud Instability Studies in Bepc*

The electron cloud instability (ECI) in the BEPC was studied systematically with experiments and simulations in recent years. Several electron cloud detectors have been installed into the BEPC storage ring to measure the electron yielding. The effects of solenoid, the clearing electrode, the chromaticity and the octupole on ECI have been investigated in BEPC experimentally. To evaluate the ECI ...

متن کامل

Power Supply Control for Bepcii Rings and Transport

ABSTRACT BEPCII will construct two rings in the current tunnel to increase the luminosity of the e-e collider. There will be approximately 400 magnet power supplies in the rings. Most magnet power supplies require 100ppm control precision and stability. Only the dipole power supply requires 50ppm control precision and stability. Using a PSC/PSI for the control of a high precision prototype PS i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001