A Practical Evaluation of an Integrated Translation Tool during a Large Scale Localisation Project
نویسنده
چکیده
This paper reports on the assessment of computer assisted translation tools for a large localisation company and the practical evaluation of one such tool.
منابع مشابه
COMPUTATIONALLY EFFICIENT OPTIMUM DESIGN OF LARGE SCALE STEEL FRAMES
Computational cost of metaheuristic based optimum design algorithms grows excessively with structure size. This results in computational inefficiency of modern metaheuristic algorithms in tackling optimum design problems of large scale structural systems. This paper attempts to provide a computationally efficient optimization tool for optimum design of large scale steel frame structures to AISC...
متن کاملEvaluation of Close-Range Photogrammetric Technique for Deformation Monitoring of Large-Scale Structures: A review
Close-range photogrammetry has been used in many applications in recent decades in various fields such as industry, cultural heritage, medicine and civil engineering. As an important tool for displacement measurement and deformation monitoring, close-range photogrammetry has generally been employed in industrial plants, quality control and accidents. Although close-range photogrammetric applica...
متن کاملTowards Measuring the Project Management Process During Large Scale Software System Implementation Phase
Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...
متن کاملA Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...
متن کاملA Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses
The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...
متن کامل