Resource Allocation in Software Projects Using a Bio-inspired Model

نویسندگان

  • Anthony Karageorgos
  • Elli Rapti
  • Vassilis C. Gerogiannis
چکیده

This paper introduces a model for supporting human resource allocation decisions in software development projects. The model’s underlying allocation method is based on an extension of the bio-inspired response threshold model and takes into account various aspects of the human resource allocation problem, such as the skills of available human resources, activity-related skill requirements as well as social ties/relationships among involved human resources. The model is demonstrated using an exemplar case problem concerning human resource allocation to a set of software development tasks.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Designing and Analyzing the New Model of Project Finance by Bank Resource Allocation towards Achieving Sustainable Economic Development

One of the most significant guiding criteria in project design and implementation is sustainable development. Banks play a critical role in environmental protection and the transition to a green economy. Green financing is an innovative financial tool that aims to achieve ecological balance while promoting economic growth. The current study intends to construct and analyze a project financing m...

متن کامل

Constrained consumable resource allocation in alternative stochastic networks via multi-objective decision making

Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of t...

متن کامل

Constrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack

This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

متن کامل

Economic and Effectiveness Evaluation Analysis of Some Resource Allocation Procedures

Review of theoretical models for cost-effectiveness and of procedures currently being used by different levels of decision makers to evaluate the projects or alternatives is the main objective of this article. To come to some conclusion that which theoretical model would be more effective to be applied for allocating the limited resources among different projects. the performance evaluation pro...

متن کامل

A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)

Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JSW

دوره 10  شماره 

صفحات  -

تاریخ انتشار 2015