Generating project risk response strategies based on CBR: A case study

نویسندگان

  • Zhi-Ping Fan
  • Yong-Hai Li
  • Yao Zhang
چکیده

Risk response is an important work in project risk management (PRM). To generate project risk response strategies, retrieving and reusing information and knowledge of the similar historical cases is important, while research concerning this issue is still relatively scarce. Taking the risk response of the subway project in S city, China as a case problem, this paper proposes a pragmatic method for generating project risk response strategies based on the case-based reasoning (CBR). The procedure of the method include the five parts: first, representing the target case and the historical cases; second, retrieving the available historical cases by judging whether the risks involved in each historical case cover or are the same as those in the target case; third, retrieving the similar historical cases by measuring the similarity between each available historical case and the target case; fourth, revising the inapplicable risk response strategies involved in the similar historical cases by analyzing the response relation between each strategy and each risk of the current project; and generating the desirable risk response strategies by evaluating each candidate risk response strategy set. To illustrate the use of the proposed method, an empirical analysis of generating the risk response strategies for the subway station project is given. The proposed method can support project managers to make the better decision in PRM. 2014 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)

In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...

متن کامل

Developing a model for simulating urban expansion based on the concept of decision risk: A case study in Babol city

Today, the study of the spatial-temporal pattern of urban physical expansion and the identification of the parameters affecting the expansion play a crucial role in urban-related decision-making and long-term planning processes. Consequently, the use of precise and efficient methods to predict the physical expansion of urban areas is of great importance. The objective of present study is to pro...

متن کامل

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

Adjusted Case-Based Software Effort Estimation Using Bees Optimization Algorithm

Case-Based Reasoning (CBR) has achieved a considerable interest from researchers for solving non-trivial or ill-defined problems such as those encountered by project managers including support for software project management in predictions and lesson learned. Software effort estimation is the key factor for successful software project management. In particular, the use of CBR for effort estimat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 42  شماره 

صفحات  -

تاریخ انتشار 2015