In this paper, we introduce a linear mathematical model for the Aggregate Production Planning problem for a forestry company operating several sawmills. Considering different types of raw materials, different production parameters, and a group of sawmills, the industry tries to identify the best levels of production, of subcontracting production, and of inventory to satisfy the demand for different product families in order to maximize its revenue. The linear model is solved efficiently with two linear programming software Cplex 8.1 and Xpress-Optimizer 16.10.02, and numerical results indicate the superiority of the latter.
منابع مشابه
A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem
In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...
متن کاملBuilding a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
متن کاملMeta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain
In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...
متن کاملDynamic Multi Period Production Planning Problem with Semi Markovian Variable Cost (TECHNICAL NOTE)
This paper develops a method for solving the single product multi-period production-planning problem, in which the production and the inventory costs of each period arc concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production-planning problem can be Stated as a ...
متن کاملA New Bi-objective Mathematical Model to Optimize Reliability and Cost of Aggregate Production Planning System in a Paper and Wood Company
In this research, a bi-objective model is developed to deal with a supply chain including multiple suppliers, multiple manufacturers, and multiple customers, addressing a multi-site, multi-period, multi-product aggregate production planning (APP) problem. This bi-objective model aims to minimize the total cost of supply chain including inventory costs, manufacturing costs, work force costs, hir...
متن کاملA new heuristic approach to solve product mix problems in a multi-bottleneck system
Product mix problem (PMP) is one of the most important and complicated problems in production systems. Different approaches have been applied to solve this problem, among them, theory of constraints (TOC) has been widely considered since 1990s. This paper develops a distinguished algorithm to solve product mix prob-lems that is efficient both in single and multi-bottleneck problems. At first, t...