The Duration of Trade Revisited : Continuous - Time vs . Discrete - Time Hazards
نویسندگان
چکیده
The recent literature on the duration of trade has predominantly analyzed the determinants of trade flow durations using Cox proportional hazards models. The purpose of this paper is to show why it is inappropriate to analyze the duration of trade with continuous-time models such as the Cox model, and to propose alternative discrete-time models which are more suitable for estimation. Briefly, the Cox model has three major drawbacks when applied to large trade data sets. First, it faces problems in the presence of many tied duration times, leading to biased coefficient estimates and standard errors. Second, it is difficult to properly control for unobserved heterogeneity, which can result in spurious duration dependence and parameter bias. Third, the Cox model imposes the restrictive and empirically questionable assumption of proportional hazards. By contrast, with discrete-time models there is no problem handling ties; unobserved heterogeneity can be controlled for without difficulty; and the restrictive proportional hazards assumption can easily be bypassed. By replicating an influential study by Besedeš and Prusa from 2006, but employing discrete-time models as well as the original Cox model, we find empirical support for each of these arguments against the Cox model. Moreover, when comparing estimation results obtained from a Cox model and our preferred discrete-time specification, we find significant differences in both the predicted hazard rates and the estimated effects of explanatory variables on the hazard. In other words, the choice between models affects the conclusions that can be drawn.
منابع مشابه
A novel technique for a class of singular boundary value problems
In this paper, Lagrange interpolation in Chebyshev-Gauss-Lobatto nodes is used to develop a procedure for finding discrete and continuous approximate solutions of a singular boundary value problem. At first, a continuous time optimization problem related to the original singular boundary value problem is proposed. Then, using the Chebyshev- Gauss-Lobatto nodes, we convert the continuous time op...
متن کاملA Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem
Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...
متن کاملTime-Varying Modeling of Systematic Risk: using High-Frequency Characterization of Tehran Stock Exchange
We decompose time-varying beta for stock into beta for continuous systematic risk and beta for discontinuous systematic risk. Brownian motion is assumed as nature of price movements in our modeling. Our empirical research is based on high-frequency data for stocks from Tehran Stock Exchange. Our market portfolio experiences 136 days out of 243 trading days with jumps which is a considerable rat...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2010