System for Evaluating Bridge Construction Plans

نویسندگان

  • Tamer El-Sayed
  • James T. O'Connor
چکیده

At present, there are no tools available for objectively evaluating the effectiveness of a bridge construction plan (BCP). As a result, bridge designers predominantly evaluate BCPs by considering only the short-term economics (i.e., construction costs). Other significant issues for project success, like safety, accessibility, and impact on local community, are evaluated based on subjective judgments, not on systematic analysis. A BCP, as defined by this research, has a direct impact on the surrounding neighborhood and on overall project performance. Hence, it is desirable to optimize a BCP through rigorous evaluations during the design phase. A model developed for such evaluations would need to perform the following specific tasks: (1) define the exact construction concerns anticipated within project execution (the definition of BCP-specific objectives other than the traditional objectives of cost and schedules); and (2) provide a means for evaluating a BCP against a multitude of objectives (given that such objectives have been defined in the previous step). Thus, the fundamental hypothesis of thls research is that a beneficial BCP evaluation tool can be developed for use in the design phase. Of course, thls suggests that there are a set of evaluation criteria that are common to all bridge construction projects that can be used as a base for BCP evaluation, and that the data available during the design phase are sufficient for performing the evaluation. This report, then, describes the development of a mechanism (model) for evaluating the effectiveness of bridge construction plans during the design phase.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investigating the role of architectural and urban planning rules and regulations in the process of designing "approved and executive" plans with emphasis on the views of architects; Case study: Architect designers working in the Qom Constru

National building regulations in most countries are part of the law and an important professional issue for many construction professionals, including engineers and architects. In addition to construction plans with titles such as approved plans that are available with the seal and signature of the designer and approved by the municipality and the Construction Engineering Organization, other pl...

متن کامل

Sustainable Development in Construction: A Tool to Bridge the Gap between Strategic and Tactical Planning

The adoption of the principles of sustainable development (SD) is increasingly seen as an important way to align the strategic plan of organizations with the specific objectives and procedures used for project execution. However, more research is still needed to identify how SD contributes to align the strategic plan of clients of the building sector with their short-term needs of construction ...

متن کامل

Influence of Underground Excavation of Large-Section Intercity Railway Tunnel on Adjacent Pile Foundation

Three-dimensional model is established with finite difference method to simulate construction process based on design and construction plans of existing overpass pile foundation adjacent to certain large-section railway tunnel in Chengdu, China. Ground, isolation pile, main bridge pier and ramp pile near the tunnel are taken as research object, and surface settlement amount, displacement change...

متن کامل

Stress-Strain Field and Theoretical Analysis of RC Bridge

In this paper, a reinforced concrete(RC) bridge built in an interchange, in the city of Kerman (a city located in south of Iran) is examined by the Structural Health Monitoring (SHM) system. During the construction of this bridge such as; the main beams, slab, and retaining walls, some Electrical Strain Gauges were mounted on the main reinforcements at different locations within the body of thi...

متن کامل

Travels Impacts of Bridge Closures 1: Lafayette Bridge Final Report

This study evaluates traffic reactions to two alternative construction plans of Lafayette Bridge crossing the Mississippi River in downtown Saint Paul, Minnesota. We calibrate a travel demand model previously developed and evaluate network performance in different construction phases of the two alternative scenarios. Most significant changes in traffic condition occur during the bridge closure ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999