Refurbishment works in a hospital during normal operation
نویسندگان
چکیده
BACKGROUND Construction and renovation work in hospitals pose risks of fungal airborne infections for immunosuppressed patients. If possible, reconstruction work will be postponed to periods without patient treatment. However, in many situations urgent damage demands immediate refurbishment works before the transferring of patients to other wards or closure of wards is possible. Reported here are infection control related measures and implemented procedures after two incidents of water damage which occurred on a surgical ward and an intensive care unit at the University hospital of Essen. METHODS Between January and April 2009 and between September and October 2009, respectively, concentration of air-borne particles and number of viable fungi were measured at two surgical wards and one ICU. Preventive Infection Control Measures included erection of protective walls and HEPA filtration of air from the renovation area. RESULTS During the renovation work on the surgical ward concentrations of moulds and particles ≥5 µm were significantly higher on the left side of the renovation area than on the right side (p=0.036 and p<0.001). Concentrations of particles ≥1 µm and particles ≥5 µm on both sides of the renovation area were significantly increased when compared with the control ward on the same floor but not when compared with the control ward on the other floor. Particles of all size were significantly elevated on the ICU during the renovation work. Aspergillus fumigatus could neither be cultured of the air of cardiac surgery intensive care unit nor of the intermediate care unit (control ward). During renovation works there was no nosocomial mould infection of patients treated on the two wards. CONCLUSION Provided that the renovation area is tightly insulated from the areas of patient care on a ward, closure does not seem to be necessary during renovation works because variation of airborne fungi is similar to that of outdoor or control air. However a multidisciplinary team should be established. This team should perform risk assessment and determine necessary protective measures before starting any construction, renovation or maintenance work in health care settings.
منابع مشابه
A hybrid approach using data envelopment analysis and case-based reasoning for housing refurbishment contractors selection and performance improvement
The refurbishment market has grown greatly in the last decade. Relevant projects are becoming increasingly more demanding in the construction industry due to the emphasis on sustainability. Most refurbishment works, however, involve a higher level of risk and uncertainty, as well as more complex coordination than new buildings. These characteristics are likely to cause asymmetric information be...
متن کاملBuilding Maintenance Strategy: A Sustainable Refurbishment Perspective
The entire life cycle of a building include construction, operation, maintenance, demolition and removal, and the normal expected life span of a commercial building may up to 100 years. During this time span, building refurbishment is an important topical in facilities management but limited attempt has been made to study the sustainable refurbishment. In fact, refurbishment strategy should alw...
متن کاملGlitches, Snags and Crises: a Study of Change in Hospital Adaptation Projects
Design and programme changes during refurbishment projects remain a considerable cause of concern for UK National Health Service (NHS) Estates managers, due to their potential to disrupt or delay projects and increase cost uncertainty. Similar concerns also impact on the engineering sector, especially in the production of complex, highly engineered products. The techniques developed to study an...
متن کاملEconomic and environmental savings of structural buildings refurbishment with demolition and reconstruction - A Portuguese benchmarking
Europe is a consolidated continent, characterized by a wide range of ancient buildings that urgently need refurbishments, especially in seismic zones such as Portugal, where structural reinforcement is imperative. However, demolishing and reconstructing also contributes to real estate renovation. In these cases it is simpler to build earthquake safe buildings that comply with current standards ...
متن کاملCustomer Behavior and Decision Making in the Refurbishment Industry-a Data Mining Approach
The study of consumer behavior in the refurbishment industry is crucial to the business operation of firms, but there is a lack of research in this regard. With reference to the EKB model specific to consumer behavior, this paper discusses the relationship among consumption characteristics, firm selection behavior and satisfaction degree of refurbishment customers. 242 valid questionnaire copie...
متن کامل