Modeling construction time in Spanish building projects

نویسندگان

  • Miguel A. Guerrero
  • Yolanda Villacampa
  • Andrés Montoyo
چکیده

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs. © 2013 Elsevier Ltd. APM and IPMA. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Reducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM)

One of the important problems in the field of Construction Industry is ‘rework’. It affects time, costs, quality, and almost every criteria of project success. As a result of rework and ineffective use of resources and materials in the workshops, there is always a considerable loss of resources, materials, investments, and workforce-time. Designing and planning through full awareness of clients...

متن کامل

The relationship between delegated responsibilities to the HSE employees and the performance indicators in the building construction projects in urban areas

Construction projects are one of the most important economic sectors in the world. At the same time, these projects are one of the hazardous industries that cause many accidents resulting from injuries and deaths, occupational diseases, delay in time, environmental problems and other direct and indirect damages. While in many industries, the issue of health, safety and environment is meticulous...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

A Methodology to Prioritize the Construction Projects of New Railway Infrastructures for Privatization in Railway Networks (Case Study: Iran)

This study aims to develop a novel methodology to prioritize the construction of new railway infrastructures for privatization. The private sector can cooperate to solve the capacity problems of railway networks, by the construction of new infrastructure. The purpose of this study is to answer the basic question that whether the capacity problems of the railway networks can be solved simply by ...

متن کامل

Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...

متن کامل

ارزیابی ریسک های ایمنی موثر بر سلامت افراد در پروژه های بلند مرتبه سازی با رویکرد فازی

  Background and aims: Today, due to the increasing of urban population and hence land shortage, construction of tall buildings are rising . The potential risks of such projects arecomparatively more than the conventional construction as the construction industry is reliant on manpower. Therefore attention to the health and safety of persons engaged in construction projects is essential.The pur...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016