Comparing variance reduction to managing system variance in a job shop

نویسندگان

  • Hemant V. Kher
  • Lawrence D. Fredendall
چکیده

Variance within the manufacturing system leads to uneven shop loads, long manufacturing lead times, and unreliable customer service. This study compares techniques that reduce system variance to techniques that manage system variance. The study is placed in a dual resource constrained job shop. Results indicate that reducing system variance improves flow time and customer service performance measures, such as mean tardiness and percent tardy jobs more than techniques that react to system variance. q 2003 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Comparison of Job-Shop and Group Technology Using Simulation by ARENA

Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own pros and cons, each of which is suitable to a specific kind of factory. ...

متن کامل

Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm

The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...

متن کامل

A Comparison of Job-shop and Group Technology Using Simulation by ARENA

Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own cons and pros, each of which is suitable to a specific kind of factory. ...

متن کامل

Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm

The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...

متن کامل

A Comparison of Job-shop and Group Technology Using Simulation by ARENA

Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own cons and pros, each of which is suitable to a specific kind of factory. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 46  شماره 

صفحات  -

تاریخ انتشار 2004