Analogy Based Prediction of Work Item Flow in Software Projects: a Case Study
نویسنده
چکیده
A software development project coordinates work by using work items that represent customer, tester, and developer found defects, enhancements, and new features. We set out to facilitate software project planning by modeling the flow of such work items and using information on historic projects to predict the work flow of an ongoing project. The history of the work items is extracted from problem tracking or configuration management databases. The web-based prediction tool allows project managers to select relevant past projects and adjust the prediction based on staffing, type, and schedule of the ongoing project. We present the workflow model, and briefly describe project prediction of a large software project for Customer Relationship Manage-
منابع مشابه
Analogy Based Prediction of Work Item Flow in Software Projects
Software development project coordinates work by using work items that represent customer, tester, and developer found defects, enhancements, and new features. We set out to facilitate software project planning by modeling the flow of such work items and using information on historic projects to predict the work flow of an ongoing project. The history of the work items is extracted from problem...
متن کاملAerodynamic Noise Computation of the Flow Field around NACA 0012 Airfoil Using Large Eddy Simulation and Acoustic Analogy
The current study presents the results of the aerodynamic noise prediction of the flow field around a NACA 0012 airfoil at a chord-based Reynolds number of 100,000 and at 8.4 degree angle of attack. An incompressible Large Eddy Simulation (LES) turbulence model is applied to obtain the instantaneous turbulent flow field. The noise prediction is performed by the Ffowcs Williams and Hawkings (FW-...
متن کاملA Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)
Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...
متن کاملThe Effect of Mental Wellbeing on Flow at Work with the Mediator Variable of Perceived Organizational Support: The Case of Payam Noor University, Khuzestan Province, Iran
Background and Aim: This study was performed to investigate the effect of mental wellbeing on flow at work with the mediator variable of perceived organizational support in Payam Noor University in Khuzestan Province, Iran. Matrials and Methods: This was an applied research project. The research population was the personnel of Payam Noor University in Khuzestan Province, Iran. The sample size ...
متن کاملPrediction and evaluation of runoff data in south of Qazvin watershed, using a fuzzy logic technique
The important criteria for designing in the most of hydrologic and hydraulic construction projects are based on runoff or peak-flow of water. Mostly, this measure and criterion is calculated or estimated by stochastic data. Another feature of these data that are used in watershed hydrological studies is their impreciseness. Therefore, in this study, in order to deal with uncertainty and impreci...
متن کامل