Applying Multi-Agent System Modelling to the Scheduling Problem in a Ceramic Tile Factory

نویسندگان

  • Adriana Giret
  • Estefanía Argente
  • Soledad Valero
  • Pedro Gómez
  • Vicente Julian
  • Estefania Argente
چکیده

The actual ceramic tile sector needs dynamic production processes to offer its clients on-line programming. Thus, companies can manage real-time response about their services and delivery times of required products, tackling a Mass Customization process in which design and sales activities are done before the production stage. The customer service must cover all activities that can improve the client satisfaction (offers, orders, after-sales services, etc.). Moreover, production tasks scheduling in a ceramic tile factory is a complex problem which requires robust and flexible software applications. Recent advances in Multi-Agent Systems applied to general scheduling problems and industrial applications have demonstrated the advantages of the agent technology in complex distributed problems. In this work we present a Multi-Agent System modelling for a scheduling problem in a ceramic tile factory. Our approach tries to improve the production performance, increase the schedule reliability and keep updated schedules. We propose a multi-agent system in which the constituent agents cooperate to find a feasible schedule taking into account on-line orders, factory layout and capacity, time constraints, anticipated demands and constraints imposed by the master plan. The value of our approach is two fold. On the one hand it is useful for defining the production tasks schedule, while on the other hand it can be suitable for simulating purposes, for example to find out whether a customer order is feasible or to figure out different schedules for a specific production lot.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Agent-based approach for cooperative scheduling

This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...

متن کامل

Assessment of manual material handling in a tile and ceramic factory using the National Institute for Occupational Safety and Health‎ equation in 2016

Background: Manual handling, lifting, or carrying of material is responsible for non-fatal injuries among employees in industries. It is the second most prevalent reported risk factor in workplaces that can lead to potential manual handling accidents and longer-term musculoskeletal disorders (MSDs). The aim of this study was the evaluation of manual material handling using the American National...

متن کامل

A Hybrid Modeling for Continuous Casting Scheduling Problem

This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...

متن کامل

Dynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture

Due to diversified and frequently changing demands from customers, technological advances and global competition, manufacturers rely on collaboration with their business partners to share costs, risks and expertise. How to take advantage of advancement of technologies to effectively support operations and create competitive advantage is critical for manufacturers to survive. To respond to these...

متن کامل

Estimation of the aerobic capacity by step test in the workers of a tile factory in Yazd in 2017

Object: Estimation of the Maximum Aerobic Capacity to Make a Physiological Proportion between Worker and the work is of calculation of the Maximum Aerobic Capacity is important to Make a Physiological Proportion between Worker and his work The purpose of this study is to estimate the highest aerobic capacity and Physical work capacityof tile and  ceramic workers . Analysis method :In this cros...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005