A Solvable Case of Emergency Supply Chain Scheduling Problem with Multi-stage Lead Times
نویسندگان
چکیده
We consider a capacitated multi-stage operations scheduling problem encountered in a real life supply chain for disaster relief, consisting of component suppliers, a packaging contractor, local distribution centers, and many customer demand points. Each customer order has a due date and can be fulfilled by either existing inventory at distribution centers or a new assembly operation at the packaging contractor. The problem is to find a production and distribution schedule to minimize the total tardiness in fulfilling the customer orders, which is computationally a difficult problem, especially when supply chain lead time is involved. In this paper, we present a polynomial time algorithm that solves this problem optimally when the order sizes are identical. The proposed solution process is based upon decomposition, and is demonstrated step-by-step through a numerical example. Future extensions of this study are also discussed.
منابع مشابه
A Genetic Algorithm Developed for a Supply Chain Scheduling Problem
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...
متن کاملA queuing-location model for in multi-product supply chain with lead time under uncertainty
Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...
متن کاملA mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem
In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...
متن کاملDynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture
Due to diversified and frequently changing demands from customers, technological advances and global competition, manufacturers rely on collaboration with their business partners to share costs, risks and expertise. How to take advantage of advancement of technologies to effectively support operations and create competitive advantage is critical for manufacturers to survive. To respond to these...
متن کاملA Two-Stage Green Supply Chain Network with a Carbon Emission Price by a Multi-objective Interior Search Algorithm
This paper presented a new two-stage green supply chain network, in which includes two innovations. Firstly, it presents a new multi-objective model for a two-stage green supply chain problem that considers the amount o...
متن کامل