Permutation flowshops in group scheduling with sequence-dependent setup times

نویسندگان

  • B. Naderi
  • Nasser Salmasi
  • N. Salmasi
چکیده

This paper focuses on the flow shop sequence dependent group scheduling (FSDGS) problem with minimisation of total completion time as the criterion (Fm|fmls, prmu, Splk|∑Cj). The research problem is formulated in form of two different mixed integer linear programming (MILP) models. Comparing with the latest MILP model for the proposed problem in the literature, the complexity size of the proposed models are significantly reduced. One of the proposed mathematical models is so effective that even medium-sized instances (problems up to 60 jobs in all groups) are solved to optimality in a reasonable amount of time. Moreover, a metaheuristic hybridising genetic and simulated annealing algorithm, called GSA, is proposed to solve the problems heuristically. All the results and analyses show the high performance of the proposed mathematical models as well as the proposed metaheuristic algorithm compared to the available ones in literature. [Received 11 February 2010; Revised 24 May 2010; Accepted 30 September 2010]

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem

Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...

متن کامل

A Multi-objective Immune System for a New Bi-objective Permutation Flowshop Problem with Sequence-dependent Setup Times

 We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012