A detailed process model for large scale data migration projects
نویسنده
چکیده
Data migration projects might sound exotic. They are not. Instead, they are common in all medium and large enterprises, e.g., when replacing applications with new (standard) software or when consolidating the IT landscape in the aftermath of mergers and acquisitions activities. Generalpurpose methodologies such as Scrum focus on managing projects. However, they do not discuss (data-migration) domain-specific tasks. These tasks are the focus and contribution of this paper. It elaborates and compiles them into a process-model. The model defines the logical and temporal dependencies between the tasks and clarifies roles and responsibilities in a migration project. Thereby, the variety of used know-how-sources sets this paper apart from any previous work in this area. We synthesize not only existing literature and own project experience in the German automotive and the Swiss banking sector. We also incorporate the results of twenty-five qualitative interviews from various industry sectors guaranteeing a high validity and applicability of our findings.
منابع مشابه
Constructive Dynamisms of Large-Scale Urban Projects by the Space Political Economy Approach; a Case Study of Mashhad Metropolis
Aims: The development of large-scale construction projects has transformed the shape of cities towards specific objectives and based on economic and political perspectives that dominate policy-making and planning in cities. The purpose of the research was to study and analyze the spatiality of Mashhad construction mega-projects and to explain the constructive forces and dynamisms of these proje...
متن کاملConcurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...
متن کاملLarge-scale Inversion of Magnetic Data Using Golub-Kahan Bidiagonalization with Truncated Generalized Cross Validation for Regularization Parameter Estimation
In this paper a fast method for large-scale sparse inversion of magnetic data is considered. The L1-norm stabilizer is used to generate models with sharp and distinct interfaces. To deal with the non-linearity introduced by the L1-norm, a model-space iteratively reweighted least squares algorithm is used. The original model matrix is factorized using the Golub-Kahan bidiagonalization that proje...
متن کاملIdentification of Pattern used in Determination of Critical Success Factors in ITS Projects, Case Study: Road Maintenance and Transportation Organization
One of the risks recognized by relevant authorities is the risk of outsourcing ITS projects. The purpose of this study was to design and explain the pattern of determining the critical success factors in outsourcing large-scale ITS projects in the Ministry of Roads and Urban Development (Road Maintenance and Transportation Organization). This study was performed using qualitative method. The pa...
متن کاملبکارگیری مدار معادل مشروح توسعهیافته در ابعاد بزرگ برای مطالعه حالت گذرای ترانسفورماتور
In this paper, frequency response analysis (FRA) of transformer based on the detailed model of the transformer windings, is investigated. The determination of the detailed model parameters, which can be considered as a large scale model, is a complex task. To overcome this problem, a heuristic method is presented in this paper. This method is applied to a large scale detailed model with n...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2012